Please login to access quizzes.

304 LCPODIVO Exam Questions with Correct Answers Rated A

Study Guides Sep 5, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

304 LCPO/DIVO Exam Questions with Correct Answers 2024/2025 Rated A+ What does 3M stand for? - Correct Answer Maintenance and Material Management What is the Navy 3M instruction? - Correct Answer NAVSEAINST 4790.8C What is the afloat safety manual? - Correct Answer OPNAVINST 5100.19 (series) What is known as the "Maintenance Bible?" - Correct Answer 43P1 (contains everything that is in SKED 3.2 for use offline) Who is the 3M system manager? - Correct Answer XO What is the ashore safety manual? - Correct Answer OPNAVINST 5100.23 (series) What system is an electronic version of everything contained in the 43P1? - Correct Answer SKED 3.2 Who is the 3M functional manager? - Correct Answer 3MC Who reviews the weekly schedule at the beginning of the week? - Correct Answer Divo/WCS Who approves revisions? - Correct Answer Department Heads Who initials line outs on MIPs/MRCs? - Correct Answer LCPO Who initiates revisions in SKED? - Correct Answer LCPO Who closes out the week? - Correct Answer Divo 1 / 2

What does MRC stand for? - Correct Answer Maintenance requirement card What is an MRC? - Correct Answer Steps to perform specific maintenance How often do MRCs need to be validated? - Correct Answer Every time maintenance is performed with that MRC What does LOEP stand for? - Correct Answer List of effective pages What is another name for the LOEP? - Correct Answer PMS 5 What is included on the LOEP? - Correct Answer Force Revision number, date the revision came out, workcenter, MIPs assigned to workcenter How often are Force Revisions? - Correct Answer Every quarter What are the non-calendar periodicities? - Correct Answer R (situational) U (unscheduled) AP (assessment procedures) What are the IEM periodicities? - Correct Answer OT (operational test) PM (periodic maintenance) LU (lay up) SU (start up) What are the requirements for IEM Status I? - Correct Answer Equipment on board and is not scheduled for corrective maintenance or overhaul and will be inactive for 7+ days

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Sep 5, 2025
Description:

304 LCPO/DIVO Exam Questions with Correct Answers Rated A+ What does 3M stand for? - Correct Answer Maintenance and Material Management What is the Navy 3M instruction? - Correct Answer NAVSEAINST ...

Get this document $30.00