3M 303 Work Center Supervisor

The purpose of the current ship's maintenance project is - ANSWER-To provide shipboard maintenance managers with a consolidated listing of deferred maintenance to identify the material condition of the ship.

The three elements of a job control number are - ANSWER-Unit identification number (UIC), Work Candidate (WC), ship's configuration change form (OPNAV 4790 l/CK)

All active MRCs listed under their respective work center MIP are displayed on the cycle schedule except - ANSWER-Situational checks

What is SKED used for? - ANSWER-Used to automate the PMS scheduling process

Who is responsible for installing a "FR"? - ANSWER-The work center supervisor

What does OMMS NG for? - ANSWER-Organizational Maintenance Management System Next Generation

What is available to the dept head in managing and reporting the material status of the department? - ANSWER-CSMP

Which of the following maintenance documents is replaced by the work candidate in OMMS- NG? - ANSWER-4790.2K (2 kilo)

Who is the ship's 3M manager - ANSWER-Executive officer

What does MDS stand for? - ANSWER-Maintenance Data System

What PMS schedule displays the planned maintenance requirements during the period between major overhauls - ANSWER-Cycle

What are the responsibilities of the departmental 3M Assistant? - ANSWER-Assist the DEPT head in 3M matters Review all Cycle and Quarterly boards Submit required reports in a timely manner

Who reviews and approves the cycle PMS schedule? - ANSWER-Department head

Who reviews and approves the quarterly PMS schedule? - ANSWER-Division officer

What is OPNAVINST 4790.8C - ANSWER-3M Manual 1 / 2

Who can initiate a FBR? - ANSWER-Anyone in the chain of command

Urgent FBR submitted for safety of personnel; ship or potential for damage to equipment must be forwarded by - ANSWER-Naval message

Who prepares the "Weekly" PMS schedule - ANSWER-Work center supervisor

Who approves the "weekly" PMS schedule - ANSWER-division officer

Who assigns serial numbers to PMS FBRs? - ANSWER-3-M Coordinator

What is the name of the electronic tag out program used onboard Ronald Reagan? -

ANSWER-SOMS

What is the primary purpose of spot checks? - ANSWER-To determine the effectiveness of PMS accomplished.

Chapter 23 of the admit safety manual 5100.19 series details precautions and procedures involving - ANSWER-Hazardous material

What does CSMP stand for? - ANSWER-Current ship's maintenance project

How many quarters are listed on the cycle schedule? - ANSWER-24 quarters

What is the only section of an MRC that a work center supervisor can make changes to without prior authorization? - ANSWER-Tools, parts, materials, test equipment

What does ACN stand for? - ANSWER-Advance Change notice

What is the OPNAVINST 4790.4C - ANSWER-3-M Maintenance Manual

Where would you find information on hazardous material? - ANSWER-NTSM 670 vol. II (HMUG Hazardous Material Users Guide)

What does the # sign stand for when next to PMS check? - ANSWER-Mandatory related maintenance

What is a category "B" FBR used for? - ANSWER-Technical

What is the primary purpose of spot checks? - ANSWER-To determine the effectiveness of PMS accomplished

Which of the following statements best describes the EGL? - ANSWER-it is a list of all pieces of identical equipment.

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 4, 2025
Description:

3M 303 Work Center Supervisor The purpose of the current ship's maintenance project is - ANSWER-To provide shipboard maintenance managers with a consolidated listing of deferred maintenance to iden...

Get this document $30.00