3M 304 Exam Questions with Complete Solutions Latest Updated 2024/2025 FBRs must be screened & forwarded by 3MC within how many days of origination in SKED? - Correct Answer 7 days What is used to confirm the # of spot checks? - Correct Answer Spot Check Matrix What are the two types of FBRs? - Correct Answer 1. Category A (Non-Technical)
- Category B (Technical)
- Urgent
What are the two types of Category B Technical FBRs? - Correct Answer 1. Routine
Which type of FBR is used to change Workcenter LOEP? - Correct Answer Category A Non-Technical Once the 3MC signs off on an FBR, what is attached to the FBR before sending the FBR off ship? - Correct Answer Serial # What does the lack of a serial # on an FBR indicate? - Correct Answer The 3MC has not signed off on the FBR What type of FBR is submitted that involves safety of personnel, the ship, or potential damage to equipment? - Correct Answer Category B - Urgent Once generated in SKED, Urgent FBRs are forwarded via what method? - Correct Answer Naval Message What program is used to report maintenance actions and configuration changes? - Correct Answer
OMMS - NG
What is a Job Control Number (JCN) comprised of? - Correct Answer 1. UIC 1 / 2
- 4 digit Workcenter Code
- 4 digit sequential job #
- 4 digit sequential job #
- / 2
What is a Job Sequence Number (JSN) comprised of? - Correct Answer 1. 4 digit Workcenter Code
Technical Review Activities are required to answer all TFBRs within how many days? - Correct Answer 21 What must be included when generating an Urgent FBR in SKED? - Correct Answer DTG of message What type of FBR is used to report technical discrepancies and clarification of procedures in PMS documentation? - Correct Answer CAT B Routine What type of FBR is submitted to request classified or other PMS documentation which cannot be obtained locally? - Correct Answer CAT A Non-Technical Technical Review Activities will provide a preliminary response for Urgent FBRs within how many days? - Correct Answer 1 working day On what day do Force Revsions (FR) take effect (implemented)? - Correct Answer First Monday of the Quarter Safety-related PMS updates (FRs) are required to be implemented within how many days of receipt? - Correct Answer 2-5 working days What document provides a definitive record of all changes to a command's 3M Program? - Correct Answer (CSAL) Change Service Accountability Log What provides a listing of the MIPs for systems and equipment assigned to each workcenter? - Correct Answer List of Effective Pages (LOEP)