ACI Concrete Field-Testing Technician - Grade I Question with Correct Answers 100% Verified The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - Correct Answer 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Correct Answer 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - Correct Answer Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - Correct Answer True The temperature of concrete may be measured in a wall form. True of False - Correct Answer True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - Correct Answer False What must be done to the sample container prior to sampling the concrete? - Correct Answer Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - Correct Answer Gently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete?

  • Correct Answer At least 2 minutes but not more than 5 minutes
  • After the temperature of the concrete is read, what is required? - Correct Answer Reporting of temperature The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - Correct Answer 1 degree F [0.5 C] According to ASTM C1064, what is one reason to take the temperature of concrete? - Correct Answer Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - Correct Answer False 1 / 2

The sample of concrete used for temperature determination must be rodded 25 times.True or False? - Correct Answer False Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - Correct Answer Compliance This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - Correct Answer Stationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - Correct Answer 15 Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - Correct Answer True The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - Correct Answer 5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - Correct Answer 15 The concrete sample must be protected from contamination and _____. - Correct Answer Rapid evaporation The minimum size sample for making strength test specimens is _____. - Correct Answer 28 L (1ft^3) When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - Correct Answer 2 The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - Correct Answer 5 When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - Correct Answer 2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - Correct Answer False The composite samples from a truck mixer must be obtained from the _____ portion of the batch. - Correct Answer Middle

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Questions & answers
Added: Sep 5, 2025
Description:

ACI Concrete Field-Testing Technician - Grade I Question with Correct Answers 100% Verified The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into t...

Get this document $30.00