ARMY EXPLOSIVES SAFETY SITE PLANNING
CERTIFICATION EXAM NEWEST 2025/2026
COMPLETE 100 QUESTIONS AND CORRECT
ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED
A+||BRAND NEW VERSION!!
What do you call the collection of documents that identifies the relationship between a PES and any facilities or personnel who may be exposed to the PES? - ANSWER-ESSP
Your installation is putting a new roof on an existing PES facility. Do you need to complete an ESSP? - ANSWER-No, this type of change does not require one
Your installation is changing the NEW of an existing facility and will be storing a hazard division not previously approved in it. Do you need to complete an ESSP? - ANSWER-Yes, and it must be approved by the DDESB
Which of the following is a phase of the ESSP process? - ANSWER- Development and Evaluation
How many ESSP categories are there? - ANSWER-Five 1 / 3
Page 2 of 18
how must the ESSP package be submitted? - ANSWER-Electronically
Which three items are in the Maps and Drawings section of an ESSP package? - ANSWER-Facilities maps Installation maps Site maps
Which three items are included in the Evaluations section of an ESSP package? - ANSWER-Electrical installation
Lightning protection information Glass hazard risk assessment
What part of the ESSP package contains background information, site location, and reason for the ESSP? - ANSWER-ESSP narrative
Who has ultimate approval authority for an ESSP? - ANSWER-DoD explosives Safety Board (DDESB)
The purpose of an Expedited Approval Request is to - ANSWER-Justify why an expedited approval is required 2 / 3
Page 3 of 18
Which four items are required on installation maps? - ANSWER- Installation boundaries
Roads and railways
Waterways and ponds
Facilities and associated utilities
Which of these is a site map requirement? - ANSWER-Scale 1 in = 400 ft
Which four items are required parts of the Transmittal Memorandum? - ANSWER-Applicable explosives safety references
Site location
Requested approve by date
Point of contact (POC) for the ESSP
- / 3