Asbestos Project Monitor Course FULL Latest Update 2025-2026 Exam 130 Questions with 100% Verified Correct Answers Guaranteed A+

According to OSHA, at what height is fall protection necessary? - CORRECT ANSWER:

  • feet

According to OSHA, at what height must scaffolding begin to have guardrails? -

CORRECT ANSWER: 10 feet

After the visual inspection for completeness of cleaning, to allow for final air sampling, the Project Monitor is required to sign that the area has passed the scope of work and

no visible debris is evident in which document? - CORRECT ANSWER: The abatement

contractor supervisor's logbook

AHERA projects require which kind of microscopy to clear large asbestos removal

projects? - CORRECT ANSWER: Transmission Electron Microscopy (TEM)

Anyone entering or exiting the work area through the Personal Decontamination Unit

must do this every time - CORRECT ANSWER: Sign in and sign out

As per NYS ICR 56, air sampling pumps used on asbestos abatement projects must

flow a minimum of how many liters per minute? - CORRECT ANSWER: 2 L/min

As per NYS ICR 56, the negative air exhaust duct location must be how many feet away

from an air intake? - CORRECT ANSWER: 15 feet

As per NYS-ICR 56, these 4 items are required to be included in the clean room of the

Personal Decontamination Unit. - CORRECT ANSWER: 1. Lockers

  • Bench 1 / 2
  • Hooks
  • Shelf

As per NYS-ICR 56, this is a required posting by the abatement contractor, project and

air monitor on the abatement site. - CORRECT ANSWER: The respective company's

handling license

As per NYS-ICR 56, what is the minimum height of the Personal Decontamination Unit?

- CORRECT ANSWER: 6 feet

As per NYS-ICR 56, what is the overlap of seams within a layer? - CORRECT

ANSWER: 6 feet

As per NYS-ICR 56, what is the ratio of workers to shower heads? - CORRECT

ANSWER: 1 shower head for every 6 workers

As per NYS-ICR 56, what is the stagger distance of seams between the first and

second layers of poly? - CORRECT ANSWER: 2 feet

Asbestos containing gaskets, packings, resilient floor coverings, and asphalts roofing products not being able to be reduced to dust by hand pressure are what NEHAP

category of nonfriable asbestos? - CORRECT ANSWER: Category 1

Before preparation duties begin inside the work area, what must be constructed? -

CORRECT ANSWER: Personal Decontamination Unit

Define the acronym ACBM - CORRECT ANSWER: Asbestos Containing Building

Material

Define the acronym ACM - CORRECT ANSWER: Asbestos Containing Material

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration