What is the IRS's principal source of legislative guidance for the construction industry? - ANSWER- IRC (Internal Revenue Code) Section 460 - Special rules for long term contracts
What is ABC? - ANSWER- Activity Based Costing 1) Links indirect costs to activities 2)Allocates "activity" cost to jobs based on specific attributes
What is a retrospective rating plan? - ANSWER- Premium determined after policy expired based upon actual loss experience 1) Incurred Loss - Insurer holds loss reserves until losses incurred 2) Expected Loss - Premium calculated on expected loss amount
- / 3
- | P a g e
What are the 2 conditions that need to be met for indirect costs to be deferred as contract costs for completed contract method or percentage of completion method? - ANSWER- 1) Costs related directly to performance of specific contract-in-progress 2) Costs related directly to the contractor's contracting activities
What are financial guarantee bonds? - ANSWER- Used for financial contracts i.e. Release of lien guarantee payment of wages and fringe released retention (when not in A/R)
What is SOP & What does it mean? - ANSWER- From the AICPA - Statements of Position
When was SOP 81-1 Issued? - ANSWER- 1981
What is the codification number of 81-1? - ANSWER- 605-3S
What is a bid bond? - ANSWER- - Done when the project is bid
- States that contractor will enter into a contract when tendered
- Surety does a "pre-qual" to make sure that the contractor has
- / 3
by the owner @ price bid and the contractor will file a performance & payment bond
capacity
- | P a g e
What are 2 types of wrap-up plans? - ANSWER- 1) Owner controlled insurance program (OCIP) 2) Contractor controlled insurance program (CCIP)
- Procurement by one party of policies protecting owner and
contractors involved
What are the 4 steps to implementing ABC (Activity Based Costing)? - ANSWER- 1) Understand the process to be costed 2) Identify activities within the process 3) Trace cost to activities using an activity survey or through payroll codes 4) Link cost drivers to cost objects
What is the Cost to Cost method of percentage of completion?What should be excluded from the calculation? - ANSWER- Step 1 - Costs to date / total estimated cost = percent complete Step 2 - percent complete x anticipated profit = amount earned to date Excluded from this calculation is stored materials and uninstalled materials
What are the four risk management techniques? - ANSWER- 1) Avoidance - Avoid risks associated with a particular operation or situation