CDS - Exam 1 Questions with 100 Verified

EXAM ELABORATIONS Sep 5, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

CDS - Exam 1 Questions with 100% Verified Correct Answers Labor and material payment bonds provide the necessary protection on public projects - Correct Answer TRUE Miller act corresponds with what.? - Correct Answer Labor and material payment bond Architects should not advise owners and the legal sufficiency of required affidavits, waivers, or releases of liens. - Correct Answer TRUE Liens are not permitted on public projects. - Correct Answer TRUE Architect must review, approve, and promptly submit shop drawings required by the contract documents. - Correct Answer TRUE An architect approved shop drawings which deviated from the contract documents. - Correct Answer Changes in contract drawings must be submitted in writing to architect before becoming affective, not equal to revisions within shop drawings.Who is responsible for errors and omissions in shop drawings? - Correct Answer General Contractor Revisions not requested by the architect on resubmitted shop drawings don't require architect's approval? - Correct Answer FALSE A contractors stamp of approval on shop drawings means that the contractor has already determined all criteria related thereto. - Correct Answer FALSE AIA document B101 is used to outline the architects service obligations? - Correct Answer TRUE The architects responsibilities are re-stated within the AIA General Conditions Doc A201. - Correct Answer TRUE Contractors may not know what services the architect is obligated to perform if what document is not part of the contract documents. - Correct Answer AIA Document B101 1 / 2

In review of shop drawings the general conditions Document A201 clearly states? - Correct Answer Matters outside the scope of the design concept and the contract documents are not reviewed.If an architect had performed their services using stipulations of AIA documents A201 & B141 within a ______ there should be no concern about professional liability. But general liability is different. - Correct Answer Standard of care Calendar days - Correct Answer 7 / Week Liquidated damages is a provision included in the? - Correct Answer Owner-contractor agreement.Document A101.An amount of money stipulated in the contract that is chargeable against the contractor is reimbursement for damages suffered by the owner because the contractors failure to fulfill his or her contractual obligation's. - Correct Answer Liquidated damages What clause should be used when a slight delay in schedule can cause a breach of contract? - Correct Answer Time is of the essence CPM is superior to a Bar Chart because it shows durations, sequences and relationships to other activities. - Correct Answer TRUE And small projects what type of progress schedule should be used? - Correct Answer Bar chart And larger complex projects what type of progress schedule should be used? - Correct Answer Critical path method CPM How many days the contractor have to notify the architect in conditions of force majeure? - Correct Answer 21 days Time extensions caused by the owner automatically entitle the contractor to monetary damages? - Correct Answer FALSE

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 5, 2025
Description:

CDS - Exam 1 Questions with 100% Verified Correct Answers Labor and material payment bonds provide the necessary protection on public projects - Correct Answer TRUE Miller act corresponds with what...

Get this document $30.00