Certified Mobile Crane Operator Prep Test Exam

EXAM ELABORATIONS Aug 27, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

1 Certified Mobile Crane Operator Prep Test/ Exam Questions with Correct Verified Answers/ Rated A+

when may a crane be overloaded? - Correct Answer - Never

what is the purpose of a boom length indicator? - Correct Answer - to provide the actual boom length at the time of use.

when can the operator leave the crane? - Correct Answer - after securing the crane

when can a crane be side loaded - Correct Answer - with a freely suspened load

When lifting personnel in man basket, which of the following may be lifted on the other load line of the crane? - Correct Answer - nothing

what is the only time a person in a man basket does not have to wear a safety harness? - Correct Answer - over water

when a job site is flooded, before action is taken, who shall be consulted? - Correct Answer - the controlling entity

Man-baskets are proof tested to what percentage - Correct Answer - 125%

  • / 3

2 The eyes of wire rope slings used to support personnel platforms shall be fabricated with what? - Correct Answer - Thimbles

Man-baskets are covered under which standards - Correct Answer - 29 CFR 1926.1431 and ANSI B30.23

who is responsible for preparing the grounds for the crane? - Correct Answer - Site supervisor

which way will the crane turn when you push the swing lever? - Correct Answer - Towards the bottom

what is the most common cause of accidents with mobiles cranes? - Correct Answer - Improper crane setup

When the crane is overloaded and working above the bold line, what could happen to the crane - Correct Answer - structural failure

the deflection of a boom will cause the load to? - Correct Answer - increase the radius

which inspection has a competent person making records of the inspection? - Correct Answer - Month

when should tag lines be used? - Correct Answer - when the rotation of the suspended load becomes hazardous

what shall be in the operator's cab during crane operations? - Correct Answer - load charts 2 / 3

3

which of the following is considered duty-cycle work? - Correct Answer - clamshell digging.

when doing the duty cycle work, most manufactures require the crane's capacity to be reduced by? - Correct Answer - 20%

which components are not parts of the boom? - Correct Answer - Heel pins

the boom angle on a lattice boom crane, is the angle between? - Correct Answer - The ground and the centerline of the boom, between the sheaves and the heel pins.

Three short audible signals means? - Correct Answer - Back-up

According to ANSI B30.5, hand signal chart shall be posted where? - Correct Answer - On the job site

a signal person shall be? - Correct Answer - A designated person, tested and qualified

an anti-two-block device can be used? - Correct Answer - To test the LMI

Cranes should be load tested when? - Correct Answer - After modifications

upon completion of assembly of the crane, what must be done? - Correct Answer - an inspection to ensure that manufacturer specifications are met

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Aug 27, 2025
Description:

Certified Mobile Crane Operator Prep Test/ Exam Questions with Correct Verified Answers/ Rated A+ when may a crane be overloaded? - Correct Answer - Never what is the purpose of a boom length indic...