Please log in to purchase this document.

CLASS AB OPERATOR FOR UNDERGROUND

EXAM ELABORATIONS Aug 30, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

  • | P a g e

CLASS A/B OPERATOR FOR UNDERGROUND

STORAGE TANK EXAM NEWEST 2025 ACTUAL

EXAM COMPLETE 100 QUESTIONS AND

CORRECT DETAILED ANSWERS (VERIFIED

ANSWERS) |ALREADY GRADED A+ ||BRAND

NEW!!

Line testing of piping shall be capable of detecting X gallons per

hour leak rate at 1 and a half times the operating pressure. X is: -

ANSWER-0.1 gallons per hour

What actions are not appropriate when when the owner/operator becomes aware of a spill or overfill? - ANSWER-Drain the spill to the storm sewer or nearby ditch

Upon confirmation of a release to the soil/groundwater/surface

water the operator shall: - ANSWER-Report the release to the

DEQ within 24 hours, by fax or phone

A Class B operator shall not be responsible for more than the

following facilities: - ANSWER-45 facilities

  • / 3
  • | P a g e

What is the minimum frequency of site inspections to assure operational compliance? - ANSWER-Quarterly

If a facility has been determined by the DEQ inspector to be out of compliance with the significant operational compliance

requirements, the DEQ shall retrain: - ANSWER-The class A

operator of the facility

When planning to permanently close a UST system, the DEQ

must be notified not less than: - ANSWER-30 days

Upon permanent Removal of an UST system, the operator shall:

  • ANSWER-Notify the DEQ within 30 days with an amended
  • registration form

The operator shall notify the DEQ of a confirmed release upon

removal of an UST and visual evidence showing: - ANSWER-

Either there is visibly contaminated groundwater in the tank cavity or there is visibly contaminated soil in the tank cavity and/or soil removed from the tank cavity

Upon removal of an UST where there is no visual or olfactoryevidence of a release , the operator shall: - ANSWER- 2 / 3

  • | P a g e

Take soil samples, analyze them, and then send the site assessment results to the DEQ for a determination

A leak should be suspected in 1,560 gallon tank if the variation between the beginning and ending manual tank gauging liquid level measurements exceeds the weekly standard of X gallons. X

is: - ANSWER-26 gallons

The class B operator should inspect the UST system for

operational compliance status at a minimum: - ANSWER-Every

quarter

Release detection records of sampling, testing, or monitoring

shall be maintained for: - ANSWER-2 years

When a tank that has been installed for less than 10 years is upgraded with the cathodic protection, tightness test(s) are

required as follows: - ANSWER-Tightness tests should be

conducted before the installation of cathodic protection and 3-6 months after the installation of the cathodic protection

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Aug 30, 2025
Description:

CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK EXAM NEWEST 2025 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ ||BRAND NEW!! Line testing of ...

Get this document $30.00