Question :Project Lifecycle

CORRECT ANSWER: :1) Establish the Need2) Engineering & Design3) Bidding & Award4) Construction5) Project Close-out6) Operation and Maintenance

Question :Project Lifecycle - Engineering and Design

CORRECT ANSWER: :- Hire primary design team- develop project layout- manage planning and scope

Question :Environmental Impact Statement

CORRECT ANSWER: :"EIS" - submitted by the designer only if needed

Question :Scoping

  • | Page

CORRECT ANSWER: :Management Activity: One of the most important responsibilities of the owner and sets design objectives for A/E

Question :Letter of Intent (LOI)

CORRECT ANSWER: :When an owner issues a notice of award to the winning contractor.

Question :Notice to Proceed

CORRECT ANSWER: :Contractor can legally start work when the owner gives this

Question :Certificate of Occupancy

CORRECT ANSWER::Granted once final inspections are passed

Question :Project Close Out

CORRECT ANSWER: :Retainage is paid, wavier on liens once all parties have been paid, and warranty period begins

  • | Page

Question :Commissioning

CORRECT ANSWER: :Done throughout industrial projects but completed at project close out on commercial projects. Basically a "check" that all appliances and other materials meet the specs and work properly. Performed by independent agents (3rd party). Focuses on MEP.

Question :Warranty

CORRECT ANSWER: :Contractor warrants certain aspects from failure/repair during project closeout.Usually a set time period.

Question :O & M Manuals

CORRECT ANSWER: :Provided by contractor to owner that outlines the project and includes info on performing services & repairs to project components.

Question :As-built documentation

  • | Page

CORRECT ANSWER: :Records all actual info for future repairs during project closeout

Question :Project delivery system

CORRECT ANSWER: :The contractual relationships between the project team members. Determines when project team members are needed and when they are procured. One of the first key risk management issues.

Question :Delivery Methods

CORRECT ANSWER: :Design Bid Build, multi-prime contracting, CM at Risk, Design build, Integrated Project Delivery.

Question :Management Methods

CORRECT ANSWER: :Agency Construction Management & Program Management

Question :Procurement Methods

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 18, 2025
Description:

CM 4221 MIDTERM EXAM QUESTIONS WITH ANSWE RS GRADED A+ Question :Project Lifecycle CORRECT ANSWER: :1) Establish the Need2) Engineering & Design3) Bidding & Award4) Construction5) Project Close-out...

Get this document $30.00