- / 5
CMCA Practice Exam 2023 Questions and Answers 1.Preparing a bid request includes which of the following A.Verifying References.B.Identifying potential contractors.C.Recommending a contractor to the board.D.Verifying contractor insurance.>>>>B 2.Legal review prior to executing a contract will assist the association in the event that A.A subcontractor is used.B.A performance bond is required.C.There is a budgetary shortfall.D.The board has questions or concerns.>>>>D 3.Rather than describing the scope of work in detail in the contract, a manager may A.Attach the bid specifications.B.Call each contractor to describe the job.C.Be on-site to oversee project content.D.Suggest the board meet the contractor to talk about the scope of work.>>>>A 1 / 2
- / 5
- Repair of the pool pump
- Annual tree pruning>>>>B
- / 2
4.In older condominiums, an association should have what type of contract covering mechanical equipment?A.Time and materials B.Specific repair C.Service C.Preventative maintenance>>>>D 5.For which project would a board most likely want to use a consultant to help develop bid specifications?A.Landscape renovation project B.Repairing and/or replacing roofs C.Painting the interior of lobbies and hallways D.Repairing HVAC and boilers>>>>B 6.In what type of contract would a waiver of lien be recommended?A.Repair of the HVAC system B.Re-roofing the buildings
7.In terms of compensation , a contract should state A.Who provides insurance coverage