Construction FE Civil Exam Questions with 100% Verified Correct Answers Is the most traditional project delivery method and appeals to those looking for low-cost bids. In this method, the owner contracts designers and builders separately. - Correct Answer Design-bid-build is a construction project delivery method where the designer and builder work together under a single contract from the beginning of the project in order to ensure unity and collaboration throughout the process. - Correct Answer Design- build Select all that clearly demonstrate an advantage of the Design-Build project delivery over the Design-

Bid-Build approach:

  • There is single point of contractual responsibility for the owner for the entire project
  • -There are contractual relationships with the Owner that prevent a conflict of interest -The design is clearly and explicitly defined at the outset of the project

  • The design includes significant collaboration between the Engineer and the Contractor
  • -The schedule can be fast-tracked and construction can begin before the complete project design is finalized

  • The Owner will receive a project at the lowest competitive cost - Correct Answer There is single
  • point of contractual responsibility for the owner for the entire project There is single point of contractual responsibility for the owner for the entire project The schedule can be fast-tracked and construction can begin before the complete project design is finalized An indemnification clause in an engineer's design contract is typically tied to:

  • Negligent engineering design
  • Claims submitted by parties affected by a failure
  • Project cost overruns
  • Improper construction methods by the Contractor - Correct Answer A. Negligent engineering
  • design 1 / 3

Collusion on a construction project typically refers to which of the following?

  • A practice where multiple contractors conspire to fix prices or rig bids
  • A system where public officials receive money from the contractor after award
  • Falsely increasing the price of change order
  • Misrepresenting the amount of work that has been completed to get advance payments - Correct
  • Answer A. A practice where multiple contractors conspire to fix prices or rig bids

A preconstruction conference should be he held:

  • Prior to advertising for bids
  • After advertising for bids but before bids are received
  • After bid opening but before award of the contract
  • After execution of an agreement but before Notice to Proceed - Correct Answer D. After execution
  • of an agreement but before Notice to Proceed Types of submittals for engineer approval typically include all the following except:

  • Product data
  • Shop drawings
  • Installation means and methods
  • Mill certificates - Correct Answer C. Installation means and methods
  • Which of the following statements best define what is meant by "substantial completion" with respect to a construction contract?

  • Project can be used and occupied by the owner and is completely finished B. Project can be used
  • and occupied by the owner but there is still a punch-list of minor work remaining

  • Contractor's performance bond will be used to finish the remaining work
  • The owner has received a final release of liens from all subcontractors - Correct Answer B. Project
  • can be used and occupied by the owner but there is still a punch-list of minor work remaining 2 / 3

a financial guarantee that the terms of a contract will be honored. If one party to a contract cannot complete their obligations, the bond is paid out to the other party to compensate for their damages or costs. - Correct Answer Performance bond

OSHA requires trench protection systems be installed for the safety of workers:

  • Whenever a trench is dug and workers will be working in the trench
  • For trenches 5 feet deep or greater unless the trench is made entirely in stable rock
  • When the work in the trench will exceed four hours
  • Only if the trench is 8 feet deep or greater or 20 feet long or greater - Correct Answer B. For
  • trenches 5 feet deep or greater unless the trench is made entirely in stable rock The basic responsibility for planning the means and methods of construction is that of the:

  • Owner
  • Inspector
  • Engineer
  • Contractor - Correct Answer D. Contractor
  • Best management practices for temporary erosion and sediment control include which of the

following? Select all that apply:

  • silt fence
  • check dams
  • vortex valves
  • mulching
  • concrete washout stations
  • stormwater wetlands - Correct Answer A. silt fence
  • check dams
  • mulching
  • concrete washout stations

What does these nomenclature stand for:

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 5, 2025
Description:

Construction FE Civil Exam Questions with 100% Verified Correct Answers Is the most traditional project delivery method and appeals to those looking for low-cost bids. In this method, the owner con...