Concrete Batch Plant Operator Exam (FDOT) – Verified Questions and CORRECT ANSWER s – Graded A+

Question : Stockpiles of aggregate shall be maintained in a

well-drained condition in order to:

CORRECT ANSWER : Minimize Free Water Content

Question : Coarse aggregate stockpiles must be sprinkled for

at lest how many hours prior to batch for FDOT?

CORRECT ANSWER : 24

Question : Free moisture of the aggregate means:

CORRECT ANSWER : Moister on the surface of an

aggregate that is above and beyond the absorbed moister in the aggregate.

Question : If the moister test is done other than by the cook-

out method, how often shall the other methods be verified?

CORRECT ANSWER : Each week

Question : For drill shaft concrete, the quantity of cement

replaced with fly ash shall be:

CORRECT ANSWER : 33 thru 37%

Question : In concrete, which material has a specific gravity

of one?

CORRECT ANSWER : Water

Question : What is the air content range for all classes of

structural concrete except Class IV Shaft?

CORRECT ANSWER : 1.00 thru 6.00%

Question : When can unmetered water be added to the

concrete?

CORRECT ANSWER : Not at all.

Question : Do not allow the total number of revolution at

mixing speed to exceed:

CORRECT ANSWER : 160 Revolutions

Question : After all materials have been charged into the

transit mixer drum, the concrete must be mixed at how many revolutions at the plant before leaving for the project?

CORRECT ANSWER : 70 to 100

Question : When the water meters / scales are calibrated, prior

to production, at what frequency should they be checked there after?

CORRECT ANSWER : 3 moths

Question : To what accuracy should the scales for weighing

cement , pozzolan, slag and aggregates at the plant be maintained

CORRECT ANSWER : 0.5% of maximum load normally

handled

Question : For concrete containing a water-reducing retarding

admixture, in an agitator truck, the maximum time for

depositing the concrete shall not exceed:

CORRECT ANSWER : 90 minutes

Question : If a load of concrete has been rejected due to

excessive slump, the concrete may remain in the transporting vehicle to reduce the slump.

CORRECT ANSWER : Is not allowed.

Question : Who places the orders for concrete with the

producer?

CORRECT ANSWER: The contractor

Question : The minimum normal sampling frequency for the

chloride content of structural concrete is:

CORRECT ANSWER : 1 per design mix in use from the

first day of production and every 30 calendar days or less thereafter.

Question : In what moister condition are the aggregates on the

approved concrete mix designs?

CORRECT ANSWER : SSD condition

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 18, 2025
Description:

Concrete Batch Plant Operator Exam (FDOT) – Verified Questions and CORRECT ANSWER s – Graded A+ Question : Stockpiles of aggregate shall be maintained in a well-drained condition in order to: C...

Get this document $30.00