ISYE 6644 - final prep2 Latest Update 2025-2026 55 Questions and 100% Verified Correct Answers Guaranteed A+

An Arena ASSIGN module can be used to assign values to attributes and variables -

CORRECT ANSWER: TRUE

An entity can be scheduled to visit the same resource twice, with different service time

distributions on the two visits! - CORRECT ANSWER: TRUE

Arena has a built-in Input Analyzer tool that allows for the fitting of certain distributions

to data. - CORRECT ANSWER: TRUE

Draw an Arena DECIDE block - CORRECT ANSWER: It's a sideways diamond.

Find x such that e 2x = 1/x. (Get within two decimals) - CORRECT ANSWER: Bisection search quickly reveals that x is about 0.4265

If f(x, y) = cxy for all 0 < x < 1 and 1 < y < 2, where c is whatever value makes this thing

integrate to 1, then X and Y are independent random variables - CORRECT ANSWER:

TRUE. (Because f(x, y) = a(x)b(y) factors nicely, and there are no funny limits.)

If W(t) is a standard Brownian motion process and a < b, find Pr(W(a) < W(b)). -

CORRECT ANSWER: W(a) − W(b) is normally distributed with mean 0. This

immediately yields a probability of 1/2.

If X1, . . . , Xn are i.i.d. Exp(1/9), what is the expected value of the sample variance S 2

? - CORRECT ANSWER: E[S^2 ] = σ^2 = 81.

  • / 2

If you are using a ranking-and-selection procedure and two competitors happen to fall within the indifference-zone, then you don't really care too much which one you end up

selecting. - CORRECT ANSWER: TRUE. That's why it's called the IZ!

In Arena, you can LEAVE a station. What is the analogous block to use to get into a

station? - CORRECT ANSWER: ENTER

In Arena, you can use a single DECIDE module to route customers to that one of four

servers having the smallest queue. - CORRECT ANSWER: TRUE

In our Arena Call Center example, it was possible for entities to be left in the system when it shut down at 7:00 p.m. (even though we stopped allowing customers to enter the system at 6:00 p.m.). - CORRECT ANSWER: TRUE — because of the small chance that a callback will occur.

In what Arena template would you find the Sequence spreadsheet? - CORRECT

ANSWER: Advanced Transfer.

Regarding Linear Congruential Generators (LCG's), select the statement that is correct.

- CORRECT ANSWER: Both full periodicity and cycle length properties should be

considered when choosing a good LCG.

Suppose I use the method of overlapping batch means with sample size n = 10000 and batch size m = 500. Approximately how many degrees of freedom will the resulting

variance estimator have? - CORRECT ANSWER: Denote b = n/m = 20. You get

approximately 3 2 (b − 1) = 28.5 d.f. (Will also accept 3b/2 = 30 or anything reasonably close.)

Suppose that I'm interested in selecting the most popular television show during a particular time period. What kind of selection problem is this — (a) normal, (b)

multinomial, or (c) Bernoulli? - CORRECT ANSWER: b

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 27, 2025
Description:

ISYE 6644 - final prep2 Latest Update 2025-2026 55 Questions and 100% Verified Correct Answers Guaranteed A+ An Arena ASSIGN module can be used to assign values to attributes and variables - CORREC...

Get this document $30.00