CPI M Part 2 Test 200 Questions with Complete Solutions 100% Verified Which of the following sequences of steps is preferred to help identify the root cause of a production problem?

a) Describe the problem; identify specific potential causes; establish cause categories; prioritize the

causes.

b) Describe the problem; establish cause categories; identify specific potential causes; prioritize the

causes.

c) Establish cause categories; describe the problem; prioritize the causes; identify specific potential

causes.

d) Identify specific potential causes; prioritize the causes; establish cause categories; describe the

problem. - Correct Answer b

Distribution requirements planning (DRP) should directly interface with:

  • master planning.
  • capacity requirements planning.
  • material requirements planning.
  • purchasing planning. - Correct Answer a
  • A major difference between an advanced planning and scheduling (APS) system and a traditional

planning system is that an APS system includes the use of:

  • finite capacity planning. 1 / 4
  • input/output analysis.
  • forward scheduling.
  • infinite loading. - Correct Answer a
  • Good measures of material planning performance include evaluations of which of the following factors?

a) Percentage of order due dates met

b) Percentage of assembly orders with no shortage

c) Percentage of orders started on time

d) All of the above - Correct Answer d

Which of the following statements about the bill of material (BOM) used in material requirements planning (MRP) is true?

a) It lists components of each assembly.

b) It plays a role in computing requirements.

c) It should be structured to reflect how a product is built.

d) All of the above - Correct Answer d 2 / 4

Which of the following order fulfillment strategies has the key demand management task of coordinating information on customers' product needs with engineering?

a) Make-to-order

b) Engineer-to-order

c) Assemble-to-order

d) Make-to-stock - Correct Answer b

Why have standard manufacturing cost accounting methods become less applicable today?

a) Material costs are a higher proportion of total costs.

b) Direct labor costs are a higher proportion of total costs.

c) Material costs are a higher proportion of total costs, and indirect labor costs are a higher proportion

of total costs.

d) Material costs are a higher proportion of total costs, direct labor costs are a higher proportion of total

costs, and indirect labor costs are a higher proportion of total costs. - Correct Answer c A company has started a total quality management (TQM) program. Work-in-process inventory will most

likely:

  • decrease.
  • increase. 3 / 4
  • be unchanged.
  • be eliminated. - Correct Answer a
  • A change from reporting operations to reporting only parts completed requires all of the following

systems to be changed except:

  • master scheduling.
  • production activity control.
  • inventory accounting.
  • cost accounting. - Correct Answer a
  • Which of the following is the most appropriate response when a significant increase in production volume is anticipated?

a) Obtaining a flexible manufacturing system

b) Implementing a focused factory concept

c) Increasing the degree of vertical integration

d) Realigning the process to match the new volume - Correct Answer d

Which of the following is the most effective way to ensure quality?

a) Preparing and retaining detailed records of defects

  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 5, 2025
Description:

CPI M Part 2 Test 200 Questions with Complete Solutions 100% Verified Which of the following sequences of steps is preferred to help identify the root cause of a production problem? a) Describe the...

Get this document $30.00