CSLB CONCRETE C8 LICENSE FINAL EXAM

What is the most common size or thickness of polyethylene sheet used as a moisture barrier (with/without sand layer) in the concrete industry? - ANSWER- 4 to 6 mil

Which of the following fastening mechanisms holds the collar strongly fixed around the finished columns? - ANSWER- Friction

If you want to place a crushed stone layer over the vapor barrier, which of the following thicknesses of polyethylene is it recommended to use? - ANSWER- 50 mil

  • / 4
  • | P a g e

Which of the following are the types of footings commonly used in the concrete construction industry? - ANSWER- ALL

-Pad footing, Strap footing, Combined footing

-Spread footing, Isolated footing, Strip footing

-Mat footing, Continuous footing, Raft footing

What is the minimum slope-away recommended in the final grading of foundation backfilling after the placement of concrete? - ANSWER- ¼" per foot pitch

Which of the following options is not related to concrete pouring preparation? - ANSWER- Legal site inspector should be available on site

Which of the following concrete pouring strategies works well for a long normal slab? - ANSWER- Start from farther area of slab

Which of the following pieces of equipment are commonly used for manual excavation for small buildings? - ANSWER- Crowbar , pickaxe, shovel 2 / 4

  • | P a g e

Explanation:

The answer is crowbar, pickaxe, and shovel because of the key phrase "small buildings" in the question.

Which of the following activities is performed to measure the quality of compaction a building foundation? - ANSWER- Proof Rolling

How many methods of construction dewatering are commonly used in concrete building projects? - ANSWER- 3

Explanation:

There are three dewatering methods as given below:

Well points Sumps and ditches Relief wells

Which of the following are the results of a concrete slump test carried out during the placing of concrete on site? - ANSWER- Zero, True, Shear , collapsed

  • / 4
  • | P a g e

What is the unit of concrete quantity take-off? - ANSWER- Cubic feet

Which of the following concrete pouring strategies is commonly adopted while filling stair steps? - ANSWER- From bottom to top

How much water needs to be added to the concrete to increase the slump value of a cubic yard of concrete by one unit? - ANSWER- One gallon

Which of the following factors increases the drying shrinkage as well as creeping in concrete structures ? - ANSWER- Low Temperature & Low Relative Humidity

Which of the following are three major types of concrete project cost estimates that are commonly used in the project planning? - ANSWER- Preliminary Estimate, Detailed Estimate, Engineer's Estimate

Explanation:

Preliminary estimate is general conceptual estimate based on the conceptual design of a project.

  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Construction and Industry
Added: Aug 3, 2025
Description:

CSLB CONCRETE C8 LICENSE FINAL EXAM, PRACTICE EXAM AND STUDY GUIDE NEWEST 2024 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! CSL...

Get this document $30.00