CSLB Contractor's Law practice test Part 2 Latest Version 2023 2024 Questions and Correct CORRECT ANSWER wers Guaranteed Success A client wants the house painted and carpet installed. What license(s) is/are required
- Painting, flooring and general building
- Painting, flooring
- General building
- Painting - CORRECT ANSWER B. Painting, flooring -A general must do 3 or more
trades
A consumer may cancel a home solicitation contract at any time prior to midnight of the ___ business day after the date of the trCORRECT ANSWER action.
- 1st
- 2nd
- 3rd
- 5th - CORRECT ANSWER C. 3rd
A notice canceling a home solicitation contract becomes effective:
- When the written notice is deposited in the mail
- When signed by the owner
- The day the owner cancels by telephone
- When the contractor receives it - CORRECT ANSWER A. When the written notice is
deposited in the mail
A Stop Notice is the only single meCORRECT ANSWER to force payment on a public- works job. You must not lien public property, so in the event a contractor needs to serve
a Stop Notice on a public-works job, he should serve it to the:
- Lender
- Prime contractor
- Awarding authority
- Division of Payments - CORRECT ANSWER C. Awarding authority - Remember
only subs use the stop notice
All of the following are causes for disciplinary action EXCEPT:
- Allowing your license to be used by any unlicensed contractor
- Entering into a contract with a contractor who is not licensed
- During bankruptcy, settling obligations, incurred as a contractor, for less than the full
- Willful, deliberate failure to pay suppliers when they are due - CORRECT ANSWER
- During bankruptcy, settling obligations, incurred as a contractor, for less than the full
- / 2
amount owed
amount owed
An "emergency" job has been contracted for between the owner and a contractor. The materials have been purchased. If the owner decides to cancel, who is responsible for the materials?
- The owner
- The contractor
- The supplier
- No one - CORRECT ANSWER A. The owner - During emergencies, the cancelation
period is waived
Bob Smith is the RME of XYZ Construction Co., where he works all week. His own construction business, under a different name and license number, builds a deck on weekends. Is this an acceptable practice for Bob?
- Yes, Bob may qualify as many licenses as he desires
- Yes, as long as he works more than 32 hours as an RME
- No, Bob must take another qualifying exam for the second license
- No, Bob may qualify only XYZ Co.'s license in this case - CORRECT ANSWER D.
No, Bob may qualify only XYZ Co.'s license in this case - An RME may qualify only one company
Bonds are often required on larger jobs. A bond company will charge approximately ____ % of its fee based on the contract price.
A. 1 - 2
- 10
- 15
D. 20 - CORRECT ANSWER A. 1 - 2
For most contractor's, the required bond needed to obtain a contractor's license is:
A. $2,500
B. $5,000
C. $7,500
D. $12,500 - CORRECT ANSWER D. $12,500
General building contractor's with a class "B" classification cannot do:
- Remodeling which includes carpentry, drywall and asbestos removal
- Painting, flooring
- General building
- Painting - CORRECT ANSWER B. Painting, flooring - A general must do 3 or more
trades
Harry and Linda have done business as a licensed partnership. If Linda is a general partner, but not qualified, what must she do to get an individual license?
- If Linda was listed as a partner on the license and was actively engaged in the
- If Linda applies for an individual license, the partnership license must be inactivated
- Linda is not entitled to apply for an individual license
- / 2
business for at least five of the past seven years, she may apply for a waiver of the exam