CWEA E/I 2 Study Guide Questions and Answers with complete solution
Question : Receiving job instruction and planning equipment
use are part of:
- craft data.
- job preparation.
- work factors.
- leveled time.
Correct answer: b. job preparation
Question : Anticipating other tasks or problems:
- usually creates additional problems.
- wastes time.
- sharply reduces the number
- often is not worth the effort.
of emergencies.
Correct answer: c sharply reduces the number of emergencies
Question : Making job planning a group effort:
- wastes time.
- improves productivity.
- causes confusion.
- All the above
Correct answer: b improves productivity
Question : Rubber safety gloves should be tested how often?
a Every 12 months
- Every 9 months
- Every 6 months
- Every 4 months
Correct answer: a Every 12 months
Question : Rubber safety blankets should be tested how often?
- Every 6 months
- Every 9 months
- Every 12 months
- Every 18 months
Correct answer: b Every 9 months
Question : What is the interrupting current of a GFIC
receptacle?
- 20 VAL
- 5 MA
- 10 UDL
- 20 MA
Correct answer: b 5 MA
Question : What type of stepladder is forbidden while
working on electrical equipment?
- Wood
- Fiberglass
- Aluminum
- Ceramic
Correct answer: c Aluminum
Question : What is the killer of electrical shock?
- Voltage
- Current
- Resistance
- Ohms
Correct answer: b Current
Question : The relationship between an electric current and a
magnetic field is called:
- matter.
- atoms.
- electromagnetism.
- element
Correct answer: c electromagnetism
Question : Electrons flowing from one place to another make
a:
- current.
- track.
- circuit.
- channel