In which project delivery method is the construction team brought on AFTER design, with open bidding? - ANSWER- - DBB
In the planning phase, Influence has a _____ impact on the project. - ANSWER- high
In which project delivery method is the construction team brought on EARLY, facilitating fast-tracking? - ANSWER- DB
Spearin Doctrine: Owner hiring designers provides contractors two
specific implied warranties: Plans and specs are _____; Plans and specs
are suitable for _____ _____. - ANSWER- - accurate
- intended purpose
- / 4
- | P a g e
What are the 5 types of project delivery systems? - ANSWER- - DB
- DBB
- CMAR
- IPD
- Multiple prime contracting
_____ is a linear sequential process. - ANSWER- DBB
In DBB, the A/E is typically selected on _____ and the GC is typically selected on _____ _____. - ANSWER- - qualifications
- low price
In DBB, design is fully completed _____ input from the GC. - ANSWER- without
In _____, the A/E is acting in the owner's interests. - ANSWER- DBB
Who controls the design team selection in DBB? - ANSWER- The Owner
The _____ project delivery method is well established and understood. -
ANSWER- DBB
- / 4
- | P a g e
Which project delivery system is consistent with public sector procurement laws and the most prevalent delivery system through the 20th century? - ANSWER- DBB
In DBB the _____ _____ is incompatible with expediting project delivery. - ANSWER- Linear sequence
in _____, the contractor's input is absent during the design process. -
ANSWER- DBB
In DBB, the Owner has a "_____ of _____ relationship" with the A/E. - ANSWER- Standard of Care Relationship
In DBB, the Owner has a "_____ relationship" with the Contractor. - ANSWER- Spearing Relationship
What 2 methods of selection (procurement methods) does CMAR use? -
ANSWER- - QBS
- Best Value
Who provides the pre-construction services for CMAR? - ANSWER- Contractor
What kind of contracting approach is usually used in CMAR? - ANSWER- Negotiated GMP
- / 4
- | P a g e
What is special about the estimating process in CMAR? - ANSWER- it is an open-book
Which delivery methods have the chance to fast track the schedule? -
ANSWER- - DB
- CMAR
In CMAR, the construction cost is determined _____ the design is completed. - ANSWER- before
In CMAR, the Owner procures and manages designers and contractors under (one / two separate) contracts? - ANSWER- two separate
In CMAR, the _____ negotiates the full commercial deal. - ANSWER- Owner
In CMAR, what is the direct contractual relationship between the contractor and designer? - ANSWER- There is no direct contractual relationship
In CMAR, there is _____ public sector authority for its use. - ANSWER- limited
In _____, the owner contracts with one single entity for both design and construction. - ANSWER- DB