DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST

EXAM ELABORATIONS Aug 30, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

  • | P a g e

DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST

2024 ACTUAL EXAM COMPLETE 500

QUESTIONS AND CORRECT DETAILED

ANSWERS (VERIFIED ANSWERS) |ALREADY

GRADED A+

DBIA EXAM 1

In which project delivery method is the construction team brought on AFTER design, with open bidding? - ANSWER- - DBB

In the planning phase, Influence has a _____ impact on the project. - ANSWER- high

In which project delivery method is the construction team brought on EARLY, facilitating fast-tracking? - ANSWER- DB

Spearin Doctrine: Owner hiring designers provides contractors two

specific implied warranties: Plans and specs are _____; Plans and specs

are suitable for _____ _____. - ANSWER- - accurate

  • intended purpose
  • / 4
  • | P a g e

What are the 5 types of project delivery systems? - ANSWER- - DB

  • DBB

- CMAR

  • IPD
  • Multiple prime contracting

_____ is a linear sequential process. - ANSWER- DBB

In DBB, the A/E is typically selected on _____ and the GC is typically selected on _____ _____. - ANSWER- - qualifications

  • low price

In DBB, design is fully completed _____ input from the GC. - ANSWER- without

In _____, the A/E is acting in the owner's interests. - ANSWER- DBB

Who controls the design team selection in DBB? - ANSWER- The Owner

The _____ project delivery method is well established and understood. -

ANSWER- DBB

  • / 4
  • | P a g e

Which project delivery system is consistent with public sector procurement laws and the most prevalent delivery system through the 20th century? - ANSWER- DBB

In DBB the _____ _____ is incompatible with expediting project delivery. - ANSWER- Linear sequence

in _____, the contractor's input is absent during the design process. -

ANSWER- DBB

In DBB, the Owner has a "_____ of _____ relationship" with the A/E. - ANSWER- Standard of Care Relationship

In DBB, the Owner has a "_____ relationship" with the Contractor. - ANSWER- Spearing Relationship

What 2 methods of selection (procurement methods) does CMAR use? -

ANSWER- - QBS

  • Best Value

Who provides the pre-construction services for CMAR? - ANSWER- Contractor

What kind of contracting approach is usually used in CMAR? - ANSWER- Negotiated GMP

  • / 4
  • | P a g e

What is special about the estimating process in CMAR? - ANSWER- it is an open-book

Which delivery methods have the chance to fast track the schedule? -

ANSWER- - DB

- CMAR

In CMAR, the construction cost is determined _____ the design is completed. - ANSWER- before

In CMAR, the Owner procures and manages designers and contractors under (one / two separate) contracts? - ANSWER- two separate

In CMAR, the _____ negotiates the full commercial deal. - ANSWER- Owner

In CMAR, what is the direct contractual relationship between the contractor and designer? - ANSWER- There is no direct contractual relationship

In CMAR, there is _____ public sector authority for its use. - ANSWER- limited

In _____, the owner contracts with one single entity for both design and construction. - ANSWER- DB

  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Aug 30, 2025
Description:

DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024 ACTUAL EXAM COMPLETE 500 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ DBIA EXAM 1 In which project delivery method is the ...

Get this document $30.00