Which project delivery for Fast food franchise:

-new facility

  • standard design
  • prescriptive specs
  • Design-Bid-Build best for this one.Process industry. rebuild after fire, upgrade facility, market timing critical***

project delivery for fastest design and construction?:

DESIGN-BUILD

Owner new to D&C, owner heavily involved, wants price competition, wants GMP before construction commitment CMAR: Construction Management at Risk. A/R still works for the owner. Can compete packages to the subtrades. If owner can't get to GMP, can complete the design and bid as typically would.Characteristics of Design-Build

  • completion time critical
  • performance-based requirements
  • collaboration important (co-location, less delays claims and disputes)
  • flexibility of approach (alternatives will be presented to meet performance)
  • Characteristics of Design-Bid-Build

  • prescriptive specs (owner controls details)
  • lowest initial price most important (low-bid) 1 / 4
  • schedule less important
  • - Characteristics of CMAR

  • prescriptive specs
  • early constructor/contractor involvement (pre-qualified subs) pre-con
  • earlier knowledge of cost than D-Bid-B
  • typically faster than D-Bid-B
  • Design Build (progressive)

  • QBS
  • involved in pre-design
  • Criteria for Design-Build

  • parameters, not solutions
  • -performance based

  • budget disclosed
  • RFP where design is 20+% developed bridging document RFP where design is 35+% Draw-Build (focus on price) RFP w 5-20% design best practice, mostly performance based Quals-based to price based Developer-led PPP and transportation 2 / 4

typically hires a design-build team Integrated Project Delivery Tri-party contract. not often in public sector Progressive Design Build

  • typically QBS
  • GMP developed later
  • key trade partners brought on later
  • what if the owner and db cannot agree? what does the off-ramp look like?
  • Distinguishing Characteristic of Design-Build ONE contractual relationship. At D-B-B and CMAR, Owner has two contract: separate contracts with A/E and Contractor What's unique about Design-Build contract?

  • not traditional A/E contracts
  • not traditional construction contracts
  • typically lump sum AND Best Value (negotiated)
  • Key factors in DB team alignment

  • Early Involvement
  • Qualifications-Based Selection
  • Cost Transparency
  • Fostering Environment of Trust
  • Integration & Collaboration

How and when team is formulated:

  • How are key trade partners selected: Quals vs low bid 3 / 4

- When are they selected:

Early- During proposal development (not waiting for buy-out Owners Role

  • Define Value in the RFP
  • disclose the budget (not a range)
  • Provide supportive and collaborative environment with a sense of urgency (benefit is
  • to obtain and early lump sum)

  • be accessible - stay continuously engaged, especially early on
  • make timely decisions (not a micro-manager...nor missing in action)
  • Owner Rep Role

  • Project Definition (pre-award, translate Owner's needs into terms that can be
  • understood by DB teams to submit proposals

- Post-award, CM agency services: solution will be performance based

Essential Owner's Rep Skills

  • technical
  • leadership
  • communication
  • facilitative
  • Successful Teaming

  • common understanding
  • trust
  • early trade partner engagement
  • -shared motivations & incentives Teaming Agreements

  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Aug 29, 2025
Description:

DBIA EXAM 2 QUESTIONS WITH CERTIFIED ANSWERS LATEST 202 4 BEST SOLUTION Which project delivery for Fast food franchise: -new facility - standard design - prescriptive specs Design-Bid-Build best fo...

Get this document $30.00