DBIA Exam Study Guide with Complete solutions 100% Verified Federal Government passed bond requiring payment and performance bonds on all public works, what year? - Correct Answers Miller Act 1935 Bill directing A/E's selected on qualifications, what year? - Correct Answers Brooks Bill 1972 Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. - Correct Answers Clinger Cohen Act/Defense Procurement Reform Act 1996 The level of quality that any average Design Professional would be able to perform given the circumstances. - Correct Answers Standard of Care Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), - Correct Answers Design Bid Build Project Delivery - Many contracts through Owner - Correct Answers Multi Prime Project Delivery method allowing the contractor to come on board very early in design for preconstruction services yet maintains separation between Designer and Builder contractually. - Correct Answers CM at Risk Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. - Correct Answers Design Build Procurement Method - Most Familiar - Correct Answers Low Bid Procurement Method - Common for A/E - Correct Answers Negotiated (Qualifications Based) Procurement Method - Qualifications and Price - Correct Answers Best Value Procurement Method - Direct - Correct Answers Sole Source 1 / 2
Contract Format w/ agreed upon fixed price - Correct Answers Lump Sum Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage - Correct Answers Cost Plus Fee Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount. - Correct Answers GMP (Guaranteed Maximum Price) Contract Format - cost per piece - Correct Answers Unit Price Contract Format - established cost/benchmark determined jointly by project team. - Correct Answers Target Price Successful Design Build requires _____ & _______ between participants - Correct Answers Trust, Flexibility Singular responsibility for both design & construction was first codified by ____ - Correct Answers Hammurabi Owner provided items such as 20% design or more and provides prescriptive specs at RFP. - Correct Answers Bridging Documents Owner is responsible for implied warranties in the sufficiency of the specifications. - Correct Answers Spearin Doctrine ____ ____ should identify end results. - Correct Answers Performance Requirements Single point of responsibility for both design & construction is an attribute of what delivery method?
- Correct Answers Design Build
- / 2
The process of checking milestones along the way for completeness. - Correct Answers Substantiation