FDOT Asphalt Paving Level 2 Exam

Questions & answers Sep 6, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

FDOT Asphalt Paving Level 2 Exam (Latest Update 2025 / 2026) Review Questions & Answers | Grade A | 100% Correct

Question:

How much asphalt should be in front of the screed being mixed by the augers?

Answer:

The proper head of material is at the center of the auger shaft

Question:

While the paver is moving the augers should be moving

Answer:

80 - 90 % of the time

  • / 3

Question:

Screed heaters can not be used to do what

Answer:

raise the heat of the mix

Question:

When matching paved joints you must have a

Answer:

Joint matcher ( sonic or shoe paddles)

Question:

The ski pole for the join matcher has to be how long

Answer:

25ft

Question:

Longitudinal (horizontal when facing down the road) joint should always be staggered how far apart

Answer:

  • to 12 inches 2 / 3

Question:

While paving an unsupported edge the edge can no deviate more than how far from the string line?

Answer:

+/- 1.5"

Question:

Tapers are required on joints when the adjacent travel lanes has a difference in elevation

Answer:

greater than 1 1/2

Question:

For the rolling straight edge the deficiencies must be fixed when

Answer:

greater than 3/16' Mark 50 feet from each side of the start and end of the deficiency

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Questions & answers
Added: Sep 6, 2025
Description:

FDOT Asphalt Paving Level 2 Exam (Latest Update) Review Questions & Answers | Grade A | 100% Correct Question: How much asphalt should be in front of the screed being mixed by the augers? Answer: T...

Get this document $30.00