Final Exam Elevator Questions and Answers 2023/2024 wrench used for rail installation - Correct Answer spud wrench

The minimum clearance form the floor to the suspended ceiling is:

  • 80"
  • 96"
  • 7'3"
  • 8'2" - Correct Answer a. 80"
  • what should you be aware of when removing a cab for replacement?

  • The weight that is to be removed from the ceiling.
  • The original weight and counterbalancing.
  • How much the cab was out of square.
  • Cover the panels so they do not get banged up. - Correct Answer b. The original
  • weight and counterbalancing.When fans are used on modernization jobs for exhausting fumes, what statement is correct?

  • They're to keep you cool, not for exhausting fumes.
  • They should direct the fumes into the hoistway.
  • They should direct the fumes into the pit.
  • They should direct the fumes to the outside. - Correct Answer d. They should direct
  • the fumes to the outside.The star symbol is used on the COP for what?

  • To show where the floor buttons are located.
  • To designate the main floor.
  • To make the door buttons stand out.
  • To show the alarm bell location. - Correct Answer b. To designate the main floor.

Using a laminate stop strip against the fence on a table saw:

  • Keeps the laminate straight to the blade.
  • Keeps the laminate from lifting off the blade.
  • Keeps the laminate from slipping under the fence.
  • Keeps the laminate from going over the fence. - Correct Answer c. Keeps the
  • laminate from slipping under the fence.

The contact adhesives must be ________ before final bonding:

  • 85 degrees
  • Dry
  • Wet to touch
  • Cold - Correct Answer b. Dry 1 / 3

What is the most important piece of equipment you have when using a power saw?

  • Combination blade
  • Safety glasses
  • Wood rule
  • Framing square - Correct Answer b. safety glasses
  • When using a circular saw, which of the following is correct?

  • Never start the cut until the blade is turning full RPM
  • The base is not adjustable for cutting depth
  • Circular saw blades range from 10 to 16 inches
  • Remove the retractable guard before cutting - Correct Answer a. Never start the cut
  • until the blade is turning full RPM What is used to make crosscuts on a table saw?

  • Push stick
  • Rip fence
  • Miter gauge
  • Larger Blade - Correct Answer c. Miter saw
  • When making crosscuts with a radial arm saw which statement is correct?

  • Push the wood slowly into the blade.
  • Restrain the blade from moving too fast.
  • Rotate and lock the blade parallel to the guide.
  • Adjust the blade 1/4" above to cutting surface - Correct Answer b. Restrain the blade
  • from moving too fast What are the two things a compound mitre saw does best at the same time?

  • moving it around and setting it up is fast.
  • You can cut left and right at the same time.
  • Tilting the blade 45 degrees and pivoting the table 45 degrees gives you a 90 degree
  • square cut.

  • bevel and mitre cuts can be made at the same time - Correct Answer d. bevel and
  • mitre cuts can be made at the same time Why do we use laminated glass in the walls of glass elevator cabs?

  • if the glass breaks you can get a replacement at the hardware store.
  • if the glass cracks the plastic interlayer holds the fragments
  • it is made in a variety of colors
  • it is easy to handle and installs quickly - Correct Answer b. if the glass cracks the
  • plastic interlayer holds the fragments Which of the following is NOT a step in preparing the walls before hanging panels?

  • check walls for square and plumb
  • mount handrails on the walls where the panels will be installed.
  • clean surfaces and fill all holes not being used 2 / 3
  • preheat walls as per specifications - Correct Answer b. mount handrails on the walls
  • where the panels will be installed When installing a resilient tile floor covering, there should be a layer of ________ between the underlayment and the tiles.

  • plywood
  • grout
  • 15lb asphalt paper
  • tile separators - Correct Answer c. 15 lb asphalt paper
  • While similar to laying resilient floor tiles, ceramic tiles require the additional steps of:

  • grouting and sealing
  • stress testing and certification
  • glazing and firing
  • marking and cutting - Correct Answer a. grouting and sealing
  • Once you are satisfied with the layout of the tiles after a dry layout, remove them and

  • stack them neatly in a location near the entrance
  • adhere adjoining tile edges so the floor pattern won't be lost
  • test each tile for durability
  • lay them out in an adjacent area to maintain the floor pattern correctly. - Correct
  • Answer d.d lay them out in an adjacent area to maintain the floor pattern correctly For carpet installation, if the cab area measures 94 inches by 62 inches and you need an extra six inches added to each dimension to account for waste during cutting, how many square yards of carpet do you need for this job?

  • 6.25
  • 6
  • 5.5
  • 5.25 - Correct Answer d. 5.25
  • if suspended glass is used with lighting fixtures, the fixture must be

  • positioned in the center of the dropped ceiling
  • concealed behind a metal grid
  • supported by a metal frame and securely fastened by at least 3 points
  • flush with the surface of the ceiling - Correct Answer c. supported by a metal frame
  • and securely fastened by at least 3 points all cab modernization should be performed at what floor?

  • at the main lobby
  • bottom floor
  • top floor
  • lowest landing - Correct Answer c. top floor
  • to meed A.D.A. requirements, hall call buttons are centered at ____ above the finished floor.

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 5, 2025
Description:

Final Exam Elevator Questions and Answers wrench used for rail installation - Correct Answer spud wrench The minimum clearance form the floor to the suspended ceiling is: a. 80" b. 96" c. 7'3" d. 8...

Get this document $30.00