Of the following, which one is not included in the scope of a certified alarm system contractor?
- Alarm circuits not originating in the alarm panel
- Wiring for data transmission circuits that do not exceed 98
- Satellite systems that are not a part of a community antenna
- Fire Alarm systems - ANSWER-A. Alarm circuits not
volts (RMS)
television distribution system.
originating in the alarm panel
The ____ usually prepares the project schedule.
- Architect
- Owner
- Project Manager
- Engineer - ANSWER-C. Project Manager 1 / 3
- | P a g e
Employee Linda was paid a gross total wage of $63,500 last year. The total amount withheld from her pay for Medicare and Social Security was ____.
A. $4,295
B. $4,403
C. $4,858
D. $5,002 - ANSWER-C. $4,858
A contract will not be enforced if it is ___.
- Oral
- Illegal
- No work is accomplished for 90 days
- All of the above - ANSWER-B. Illegal
The type of insurance that covers the contractor for losses of material in transit or at temporary storage facilities is known as ___ insurance.
- Liability
- Builders Risk
- Auto Liability 2 / 3
- | P a g e
- Fidelity Bond - ANSWER-B. Builders Risk
The ____ has the duty to record and post a Notice of Commencement to improve real property.
- Owner
- Agent
- Contractor
- Any of the above - ANSWER-A. Owner
If at all possible, sling angles should be kept greater than ____ degrees.
- 25
- 45
- 60
D. 90 - ANSWER-B. 45
The type of contract where in the contractor agrees to carry out a stipulated job in exchange for a fixed sum of money is a _____ contract.
- Cost plus fixed