Florida GC Exam - Project Management Section

EXAM ELABORATIONS Aug 27, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Florida GC Exam - Project Management Section Save Stretch your brain before your first study session Learn1 / 6Study with Learn Post-tensioned Concrete Slabs Choose matching term 1

  • According to ASTM C94, when truck mixers are used the load must be completely
  • discharged within______ after batching.(Design and Control of Concrete Mixtures --> Mixing Concrete) 2

  • In _______ , the tendons are raised higher above the forms in the vicinity of the
  • supporting column than at the midspan of the slab.(Principles and Practices of Commercial Construction --> Tendon, Post Tensioning) 3

  • Where the ______ of soil is in doubt, the building official shall be permitted to require
  • a geotechnical investigation.Florida Building Code --> Soils and Foundations, Geotechnical Investigation) 1 / 3

Terms in this set (130) Well-blasted rock has a

swell percentage of:

(Principles and Practices of Commercial Construction --> Earthwork) 20% Lifelines in areas subjected to cutting or abrasion shall be a minimum of ______ inch wire core manila rope

(OSHA)

7/8 All excavations made in Type B soil 20 feet or less in depth which have vertically sided lower portions shall be shielded or supported to a height _____ inches above the top of the vertical side

(OSHA)

At least 18 inches 4 The calculated fire-resistance rating for a 3.8 inch thick sand and light weight aggregate precast concrete wall shall be _______ hour(s).(Florida Building Code --> Calculated Fire Resistance) Don't know? 2 / 3

The calculated fire- resistance rating for a 3.8 inch thick sand and light weight aggregate precast concrete wall shall be _______ hour(s).(Florida Building Code --> Calculated Fire Resistance)

  • hours
  • Welded splices are almost always necessary in_______.(Reinforcing Bars --> Welding) Precast Concrete Construction

  • The OSHA area office
  • has a maximum of ____ days to assess the penalty for failure to abate a violation.(Florida Contractors Manual --> Categories of Violations) 30 Days

  • High-density R-30 batts
  • used in cathedral ceilings are_____ inches thick.(Energy Efficient Building Construction --> Cathedral Ceilings)

8 - 1/4

  • According to ASTM
  • C94, when truck mixers are used the load must be completely discharged within______ after batching.(Design and Control of Concrete Mixtures --> Mixing Concrete) 90 Minutes

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Aug 27, 2025
Description:

Florida GC Exam - Project Management Section Save Stretch your brain before your first study session Learn Study with Learn Post-tensioned Concrete Slabs Choose matching term 8. According to ASTM C...

Get this document $30.00