Florida GC Exam - Project Management Section Save Stretch your brain before your first study session Learn1 / 6Study with Learn Post-tensioned Concrete Slabs Choose matching term 1
- According to ASTM C94, when truck mixers are used the load must be completely
- In _______ , the tendons are raised higher above the forms in the vicinity of the
- Where the ______ of soil is in doubt, the building official shall be permitted to require
discharged within______ after batching.(Design and Control of Concrete Mixtures --> Mixing Concrete) 2
supporting column than at the midspan of the slab.(Principles and Practices of Commercial Construction --> Tendon, Post Tensioning) 3
a geotechnical investigation.Florida Building Code --> Soils and Foundations, Geotechnical Investigation) 1 / 3
Terms in this set (130) Well-blasted rock has a
swell percentage of:
(Principles and Practices of Commercial Construction --> Earthwork) 20% Lifelines in areas subjected to cutting or abrasion shall be a minimum of ______ inch wire core manila rope
(OSHA)
7/8 All excavations made in Type B soil 20 feet or less in depth which have vertically sided lower portions shall be shielded or supported to a height _____ inches above the top of the vertical side
(OSHA)
At least 18 inches 4 The calculated fire-resistance rating for a 3.8 inch thick sand and light weight aggregate precast concrete wall shall be _______ hour(s).(Florida Building Code --> Calculated Fire Resistance) Don't know? 2 / 3
The calculated fire- resistance rating for a 3.8 inch thick sand and light weight aggregate precast concrete wall shall be _______ hour(s).(Florida Building Code --> Calculated Fire Resistance)
- hours
- The OSHA area office
- High-density R-30 batts
Welded splices are almost always necessary in_______.(Reinforcing Bars --> Welding) Precast Concrete Construction
has a maximum of ____ days to assess the penalty for failure to abate a violation.(Florida Contractors Manual --> Categories of Violations) 30 Days
used in cathedral ceilings are_____ inches thick.(Energy Efficient Building Construction --> Cathedral Ceilings)
8 - 1/4
- According to ASTM
- / 3
C94, when truck mixers are used the load must be completely discharged within______ after batching.(Design and Control of Concrete Mixtures --> Mixing Concrete) 90 Minutes