ICC General Requirements Practice Exam Questions With Complete Solutions

Question 1: Who performs a structural observation?

  • the RDP in responsible charge
  • The special inspector
  • The contractor
  • The building official

CORRECT ANSWER : A) the RDP in responsible charge

Question 2: Who prepares the statement of special inspections?

  • The building offficial
  • The contractor
  • The owner
  • The RDP

CORRECT ANSWER : D) The RDP

Question 3: Who is in charge of reviewing and approving

reports?

  • The building offficial
  • | Page
  • The contractor
  • The owner
  • The RDP

CORRECT ANSWER : D) The RDP

Question 4: ICC exams are based on which document?

a) ACI

b) IBC

c) ASTM

CORRECT ANSWER : B) IBC

Question 5: Who is in charge of giving "approval to proceed"

  • The building offficial
  • The contractor
  • The owner
  • The RDP

CORRECT ANSWER : A

  • | Page

Question 6: Who responds to reports of uncorrected

discrepancies?

  • The building official
  • the contractor
  • The owner
  • The RDP

CORRECT ANSWER : D) The RDP

Question 7: What does a special inspector's job NOT entail

while on the job site?

  • instructing the contractor;s workers on how to do their job
  • Verify means and methods of construction
  • Inform the contractor of arrival
  • Discuss with the contractor any discrepancies as they may
  • come up later in a lawsuit

CORRECT ANSWER : A) Instructing the contractor's workers

on how to their job

  • | Page

Question 8: What should a special inspector NOT do prior to

arriving to the jobsite?

  • Attend a preconstruction meeting
  • Review the construction documents
  • Discuss frequency of reports with the building official
  • Ask any questions you may have

CORRECT ANSWER : A) Attend a preconstruction meeting

Question 9: Which of the following should a special inspector

contact the contractor about immediately?

  • If the concrete temperature is 80 degrees
  • If the slump calls for a maximum of 4' but is 6'
  • If the air content calls for 6% but is 3%
  • If the steel isn't tied properly

CORRECT ANSWER : B and C

Question 10: Can a material not listed in the IBC be used for

construction?

  • Yes

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 15, 2025
Description:

ICC General Requirements Practice Exam Questions With Complete Solutions Question 1: Who performs a structural observation? A) the RDP in responsible charge B) The special inspector C) The contract...

Get this document $30.00