ICC / UST / Real Exam Questions with Correct Answers, A+ Score Solutions Stretch your brain before your first study session Terms in this set (40) Learn / Study with Learn designs and certifies cathodic protection system Choose matching term 1Corrosion Specialist2 Spill container shall meet the
following requirements:
3 Within ______ of affixing red tag, local agency shall notify own of significant violation 4 Owners/ops shall submit SCT results to local agency within ____ days of completion Don't know?Corrosion Specialist designs and certifies cathodic protection system 1 / 2
Secondary containment shall be constructed to contain at
least the following volumes:
Cathodic protection tester will test cathodic protection system within __ months of installation and every __ years thereafter Spill container shall meet
the following requirements:
Overfill prevention shall alert transfer operator when tank is __% full Flapper Valves shall provide positive shut off when tank is filled to no more than __% capacity Primary pressurized piping shall be tested for tightness hydrostatically at __% of design operating pressure Date that all UST systems must have Line Leak Detector installed
- 100% of usable capacity of primary where there is
- 150% of the largest container if there are multiple
- months
- years
- If made of metal, exterior wall shall be protected
- Shall have minimum capacity of 5 gallons (19 L)
- Shall have drain valve which allows drainage of the
- / 2
only one primary is within the secondary
primary containers in a single secondary
from galvanic corrosion
collected spill into the primary container or provide means to keep spill cont empty 90% 95% 150% November 9,2004