Lean Bronze Test Guide with Complete Solutions 5S stands for - Correct Answer Sort, Stabilize, Shine, Standardize, Sustain Total Productive Maintenance (TPM) is a lean technique that - - Correct Answer Maximizes the productivity of equipment Types of waste that might be difficult to find are - - Correct Answer Unnecessary Motion, Overprocessing, Waiting Poke-Yoke is a technique which is used to prevent - - Correct Answer Human errors being converted into defects In a nutshell, lean six sigma is considered - - Correct Answer A business improvement approach A company struggling with low performance in terms of quality, profitability, and productivity is considering a six sigma initiative. A decision to proceed would be considered - - Correct Answer Smart, they obviously need the six sigma structure.If a company were to evaluate why some customers refused to purchase a newly released product, what Deming cycle phase would apply - - Correct Answer Plan Which of the following statements best describe discrete data - - Correct Answer Of 225 people in the plane, 85 had connecting flights Which of the following statements best describe discrete data - - Correct Answer Number of employees wearing green shirts Which of the tools help us visualize "What?, Where?, When? 1 / 2

And Who?"? - - Correct Answer Pareto chart, Tree Diagram, Flow chart What other names and/or acronyms are used to refer to the PDCA cycle - - Correct Answer PDSA (Plan, Do, Study, Act), The Deming Cycle Effective communications require that the message be - - Correct Answer Received, understood and acted on in the desired manner Which type of problem does the image best represent - - Correct Answer Performance to standard varies (not consistently achieved) A system for monitoring the implemented solution, along with specific metrics to be used for process auditing occurs in

which DMAIC phase - - Correct Answer Measure, Define, Communicate, ANSWER: NONE

To be effective, root cause analysis must be performed - - Correct Answer Systematically with conclusions backed up by data DMAIC stands for - - Correct Answer Define, Measure, Analyze, Improve, Control When performing root cause analysis, gathering data occurs in which step? - - Correct Answer After the issues that contributed to the problem has been identified The "Define" Phase in DMADV includes which of the following - - Correct Answer Project Charter All of the factors that contribute to a production problem must be discovered. Which of the following problem solving tools would be the best selection? - - Correct Answer Fishbone Diagrams In which situation might the largest category NOT be addressed - - Correct Answer Due to cost, safety, and/or regulatory constraints

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 5, 2025
Description:

Lean Bronze Test Guide with Complete Solutions 5S stands for - Correct Answer Sort, Stabilize, Shine, Standardize, Sustain Total Productive Maintenance (TPM) is a lean technique that - - Correct An...

Get this document $30.00