Lean Six Sigma Green Belt IASSC Latest Update

EXAM ELABORATIONS Aug 30, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Lean Six Sigma Green Belt IASSC Latest Update 2024-2025 Actual Exam 225 Questions and 100% Verified Correct Answers Guaranteed A+ Verified by Professor

(Within DPMO) How is Total number of opportunities calculated? - CORRECT

ANSWER: Units*Number of opportunities per unit

3 M's of Lean - CORRECT ANSWER: Muda, Muri, Mura

  • Whys technique - CORRECT ANSWER: asks iterative questions to find the root cause

5S - CORRECT ANSWER: Organize work area: Sort, Set in order, Shine, Standardize, Sustain

5S helps in..? - CORRECT ANSWER: Improving the workplace, productivity and

maintenance

A Measurement System Analysis (MSA) is needed prior to any...? - CORRECT

ANSWER: data collection activities

A project charter - CORRECT ANSWER: Define's a team's mission, scope of operation, objectives, time frame, and consequences for the project

A project plan - CORRECT ANSWER: An approved document used to control and

manage a project

A test-statistic is used to ? - CORRECT ANSWER: Determine the validity of a

hypothesis test

  • / 3

Affinity Diagram - CORRECT ANSWER: Method used by teams to organize several

ideas

Alternative Hypothesis - CORRECT ANSWER: The hypothesis that states there is A

DIFFERENCE OR CHANGE

Another name for Attribute data - CORRECT ANSWER: Discrete

Another word for Variable data - CORRECT ANSWER: Continuous

Apart from financial accounting, Business Score Card (BSC) also considers? -

CORRECT ANSWER: Internal processes, customer satisfaction, and learning and

growth

Benchmarking - CORRECT ANSWER: Comparing an organization's business

processes, practices, and performance metrics with that of industry leaders.

Bias The measure of distance between the measure value and the true or actual value -

CORRECT ANSWER: The measure of distance between the measure value and the

true or actual value

Binomial Distribution - CORRECT ANSWER: -Defective items

-Sample size > 30, >10%

Business Process (SIPOC) - CORRECT ANSWER: Supplier, Input, Process, Output,

Customer

C chart used for - CORRECT ANSWER: Defective which have constant subgroups size

and is represented as number of defects

  • / 3

Cause and Effect Diagram is used to? - CORRECT ANSWER: Find the the root cause

and the potential solutions to a problem

Census - CORRECT ANSWER: A study that obtains data from every member of a

population

Chi-Square Distribution - CORRECT ANSWER: -Used in Inferential Statistics

-Used in hypothesis test

Chosen as an industry standard and accounts for 99% of Measurement System

variation? - CORRECT ANSWER: 5.15

Combination - CORRECT ANSWER: The unordered arrangement of a set, group, or

number of things

Common Lean tools and techniques - CORRECT ANSWER: Poka-Yoke, 5S, Kaizen,

JIT, Heinjunka, Standardized Work, Take Time

Comparing Cp and Cpk if Cpk < Cp **Cpk can never be larger than Cp because Cp represents the maximum capability with the current process variation Cp= process performing at MAXIMUM capability Cpk = how the process is CURRENTLY performing - CORRECT ANSWER: -> Mean is not centered between specification limits

Control Pan - CORRECT ANSWER: Written summary description of the system for

controlling a process

Control plan tools - CORRECT ANSWER: -Control cahrts

-MSA -Error-proofing -SOP

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Aug 30, 2025
Description:

Lean Six Sigma Green Belt IASSC Latest Update 2024-2025 Actual Exam 225 Questions and 100% Verified Correct Answers Guaranteed A+ Verified by Professor (Within DPMO) How is Total number of opportun...

Get this document $30.00