MGT 3332 - Chapters 1-5 Exam Questions with 100% Verified Correct Answers The term capacity refers to the maximum quantity an operating unit can process over a given period of time. - Correct Answer TRUE Capacity decisions are usually one time decisions; once they have been made, we know the limits of our operations. - Correct Answer FALSE Capacity in excess of expected demand that is intended to offset uncertainty is a:
- positioning hedge.
- capacity cushion.
- margin protect.
- line balance.
- timing bubble. - Correct Answer capacity cushion.
Given the following information, what would efficiency be? Effective Capacity = 50 Units per day, Design Capacity = 100 units per day, Actual output = 30 units per day - Correct Answer 60% Given the following information, what would efficiency be?Effective Capacity = 80 Units per day Design Capacity = 100 units per day Utilization = 48 percent - Correct Answer 60%
Unbalanced systems are evidenced by:
- labor unrest.
- top-heavy operations.
- bottleneck operations.
- assembly lines.
- increasing capacities. - Correct Answer bottleneck operations.
One approach to extending a product's life cycle is to promote alternate uses of the product. - Correct Answer TRUE 1 / 2
Design for production takes into account the capabilities of the organization to produce or deliver a given product or service. - Correct Answer TRUE Concurrent engineering brings people concerned with manufacturing into the design phase earlier than in the "over-the-wall" approach. - Correct Answer TRUE A major benefit of computer-aided design (CAD) is the increased productivity of designers. - Correct Answer TRUE Product failures can be easier to remedy with modular design. - Correct Answer TRUE One of the main advantages of standardization is that it increases the potential variety of products. - Correct Answer FALSE Reducing consumer choices makes service more efficient. - Correct Answer TRUE The process of dismantling and inspecting a competitor's product to discover product improvement is called benchmarking. - Correct Answer FALSE Concurrent engineering is another term for sequential development. - Correct Answer FALSE A disadvantage of standardization is the possibility of standardizing designs too early, which may make them difficult to modify in the future. - Correct Answer TRUE One structured approach for integrating customer requirements into every aspect of product
development is:
- customer satisfaction.
- quality function deployment.
- total quality management.
- customer integration.
- a product development team. - Correct Answer quality function deployment.
- / 2