Mold Assessor Technician Exam with

EXAM ELABORATIONS Sep 5, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Mold Assessor Technician Exam 2024/2025 with Correct Answers Rated A+ The Texas Mold Assessment and Remediation Rules states that notice signs must be legible from:

  • 5 feet
  • 10 feet
  • 15 feet
  • 25 feet - Correct Answer b. 10 feet
  • After completing any training course required by the Texas Mold Assessment and Remediation Rules, how long do you have to take and pass the state examination?

  • 6 weeks
  • 6 months
  • 9 months
  • 1 year - Correct Answer b. 6 months

The assigned protection factor (PF) for an N-95 respirator is:

  • 5 - 10
  • 20 - 30
  • 40 - 50
  • 60 - 70
  • There is no PF rating for an N-95 respirator - Correct Answer a. 5 - 10
  • According to the EPA's "Mold Remediation in Schools and Commercial Buildings" document, the EPA recommends the following for cleanup of books and papers that were damaged with clean water within

24-48 hours:

  • Discard all books and papers
  • Photocopy and discard originals
  • Freeze or freeze-dry originals
  • None of the above 1 / 2
  • A., B. and C. above - Correct Answer e. A., B. and C. above
  • Discard all books and papers.,
  • Photocopy and discard originals, and
  • Freeze or freeze-dry originals

When sampling with a spore trap you are usually trying to determine:

  • Species identification of surface molds
  • Species identification of airborne molds
  • Genus identification of surface molds
  • Genus identification of airborne molds
  • Identification of viable mold spores - Correct Answer d. Genus identification of airborne molds
  • Which of the following sampling devices would you use to determine respirable and non-respirable

viable airborne mold spores?:

  • Air-O-Cell cassette
  • Tape mount
  • Andersen Sampler
  • Allergenco Sampler
  • Swap Sampler - Correct Answer c. Andersen Sampler
  • According to the Texas Mold Assessment and Remediation Rules, if a contractor is working under the Exceptions and Exemptions subsection and identifies additional mold that affects a total surface area

of more than 25 contiguous square feet they shall:

  • Continue working and hope no one notices.
  • Immediately cease all remediation work and replace any contaminated materials so an assessment
  • can be performed.

  • Immediately cease all remediation work and implement emergency containment if necessary.
  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 5, 2025
Description:

Mold Assessor Technician Exam with Correct Answers Rated A+ The Texas Mold Assessment and Remediation Rules states that notice signs must be legible from: a. 5 feet b. 10 feet c. 15 feet d. 25 feet...

Get this document $30.00