Mold Remediation Contractor Test

EXAM ELABORATIONS Sep 4, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Mold Remediation Contractor Test

  • The Texas Mold Assessment and Remediation Rules states that notice signs must be legible

from:

  • 5 feet
  • 10 feet [ANSWER]
  • 15 feet
  • 25 feet
  • Upon completing any training course required by the Texas Mold Assessment and
  • Remediation Rules, how long do you have to take and pass the state examination?

  • 6 weeks
  • 6 months [ANSWER]
  • 9 months
  • 1 year

3. The assigned protection factor (PF) for an N-95 respirator is:

  • 5 – 10 [ANSWER]
  • 20 – 30
  • 40 – 50
  • 60 – 70
  • There is no PF rating for an N-95 respirator
  • According to the EPA’s “Mold Remediation in Schools and Commercial Buildings”
  • document, the EPA recommends the following for cleanup of books and papers that were

damaged with clean water within 24-48 hours:

  • Discard all books and papers
  • Photocopy and discard originals
  • Freeze or freeze-dry originals
  • A., B. and C. above [ANSWER]
  • According to the Texas Mold Assessment and Remediation Rules, a Remediation Contractor

is licensed to:

  • Write a Mold Remediation Protocol
  • Write a Mold Assessment 1 / 3
  • Perform Clearance Testing
  • Perform mold remediation [ANSWER]
  • Apply Biocides
  • According to Table 2 of the EPA’s “Mold Remediation in Schools and Commercial
  • Buildings”, the containment recommended for a contaminated area of greater than 100 square

feet is:

  • None
  • Minimum
  • Limited
  • Full [ANSWER]
  • According to the Texas Mold Assessment and Remediation Rules, if a contractor is working
  • under the Exceptions and Exemptions subsection and identifies additional mold that affects a

total surface area of more than 25 contiguous square feet they shall:

  • Continue working and hope no one notices.
  • Immediately cease all remediation work and replace any contaminated materials so an
  • assessment can be performed.

  • Immediately cease all remediation work and implement emergency containment if
  • necessary. [ANSWER]

  • Immediately cease all remediation work and contact the Department.
  • According to the Texas Mold Assessment and Remediation Rules, a containment area is

defined as:

  • An area that has been enclosed to house violent criminals
  • An area that has been enclosed to control the release of harmful vapors into the surrounding
  • area.

  • An area that has been enclosed to control the release of mold or mold-containing vapors
  • into the surrounding area. [ANSWER]

  • An area that has been enclosed to control the release of chemicals into the surrounding area.

9. A musty odor indoors usually indicates:

  • Mildewed laundry
  • Moist conditions
  • Microbial growth [ANSWER]
  • Poor housekeeping
  • Wrong building materials 2 / 3
  • Skin and eye protection during the remediation process is used to protect workers from:
  • Mold toxins and spores
  • Dust mites
  • Cleaning products
  • A., B. and C. [ANSWER]
  • According to the Texas Mold Assessment and Remediation Rules the required clearance

level of mold spores is:

  • Less than one-half the outdoor spore count [ANSWER]
  • Less than one tenth the initial spore count before remediation
  • Not more than 100 spores of any one type of mold
  • No presence of toxigenic mold spores
  • None of the above
  • According to the EPA’s “Mold Remediation in Schools and Commercial Buildings”, the

recommended clean up method for carpet and backing with mold growth is:

  • Wet vacuuming
  • Discarding
  • HEPA vacuuming
  • A., B. and D. above [ANSWER]
  • Damp wiping

13. Non-porous hard surface areas can be:

  • Cleaned with a detergent solution [ANSWER]
  • Should be disposed of
  • Stored
  • Remediated

14. What is the highest priority or concern during a Mold Remediation Project:

  • Removal of all mold and mold contaminated material
  • Getting paid the full amount for the job
  • Avoid exposing workers and occupants to mold or mold contaminated dust [ANSWER]
  • Saving all valuable items
  • Not committing any Critical Level violations
  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 4, 2025
Description:

Mold Remediation Contractor Test 1. The Texas Mold Assessment and Remediation Rules states that notice signs must be legible from: a. 5 feet b. 10 feet [ANSWER] c. 15 feet d. 25 feet 2. Upon comple...

Get this document $30.00