NACE CIP 1 Exam Q & A
Project inspection documentation provides
Correct Answer:
- QC records
- Management Information
- Verification of work
- Details of non-conformance work
People who may be required to attend
Correct Answer:
- Owner
- Engineer
- Ops personnel
- Specifier
- Purchase agent
- Coating manufacturer
- Coating inspector
- Project safety
- Coating applicator
- / 4
Good records allow management to:
Correct Answer:
- Detect design defects
- Evacuate coating performance
- Develop ongoing maintenance program
- Determine annual cost data
Inspection records show:
Correct Answer:
- Environmental conditions
- pretreatment details
- Cleaning details
- Materials information
- Coating applications
- Tests results
Documentation may include
Correct Answer:
- Daily reports
- Inspection logs
- Routine reports
- Monthly/quarterly reports
- / 4
Goals of a pre-job conference
Correct Answer:
- HSE discussion
- Address/clarify emergency procedures
- Review SOW
- Review logistical support
- Discuss/clarify inspector responsibilities
- Clarify chain of command
Common errors using replica tape
Correct Answer:
- Variation in point to point profile
- Dirt on tape/gauge
- Gauge accuracy 4. Rubbing technique
Standards for replica tape
Correct Answer:
- RP-0287-95-Accuracy
- ASTM 4417-93-Reproducibility
- / 4
- types of replica tape
Correct Answer:
Coarse and extra coarse
Iso comparator grades may by recorded as:
Correct Answer:
- Finer than fine
- Fine
- Medium
- Coarse
- Coarser than coarse
Depth of profile can be evaluated by:
Correct Answer:
- Iso comparators
- Replica tape
- Digital profile gauge
- / 4