- | P a g e
NCCCO Tower Crane Exam Questions and 100% Correct Verified ANSWERs| Grade A
- Which OSHA regulation governs suspended personnel
- 1926.251
- 1926.1431
- 1926.1408
platforms?
- ANSWER: b. 1926.1431
- According to ASME B30.3, what is the prohibited zone
- 10 feet
- 15 feet
- 20 feet
distance for power lines that are 60 kV?
- ANSWER: b. 15 feet
- According to ASME B30.3, what is the design factor for load
- 3.5 to 1
- 5 to 1
- 7 to 1
hoist rotation-resistant wire rope?
- ANSWER: b. 5 to 1
- | P a g e
- According to ASME B30.3, when lifting a suspended
- 5 to 1
- 7 to 1
- 10 to 1
personnel platform, what is the design factor for the rigging hardware?
- ANSWER: a. 5 to 1
- According to ASME B30.3, what is the design factor for load
- 3.5 to 1
- 5 to 1
- 7 to 1
hoist ropes that are not rotation-resistant?
- ANSWER: b. 5 to 1
- What is the OSHA construction standard for rigging
- 1926.1431
- 1926.251
- 1926.550
equipment?
- ANSWER: b. 1926.251
- | P a g e
- According to ASME B30.3, on whose recommendations
- Crane operator
- Crane manufacturer
- Site supervisor
should a preventative maintenance program be set up?
- ANSWER: b. Crane manufacturer
- When using cable or nylon spreaders, what is important to
- Lowering the spreader angle reduces tension
- Lowering the spreader angle increases tension
- The angle has no effect on tension
remember about the spreader angle?
- ANSWER: b. Lowering the spreader angle increases tension
- According to OSHA, when testing a man basket, how long
- 2 minutes
- 5 minutes
- 10 minutes
must the test pick be maintained?
- ANSWER: b. 5 minutes
- | P a g e
- According to ASME B30.3, what is the minimum pitch
- Not less than 16 times rope diameter
- Not less than 18 times rope diameter
- Not less than 20 times rope diameter
diameter for load hoisting sheaves?
- ANSWER: b. Not less than 18 times rope diameter
- According to ASME B30.3, what is the minimum pitch
- Not less than 15 times rope diameter
- Not less than 16 times rope diameter
- Not less than 18 times rope diameter
diameter for load block sheaves?
- ANSWER: b. Not less than 16 times rope diameter
- According to ASME B30.3, what is the minimum pitch
- Not less than 15 times rope diameter
- Not less than 16 times rope diameter
- Not less than 18 times rope diameter
diameter for boom hoist sheaves?