What is the purpose of a labor and material payment bond? - CORRECT ANSWER -This is used to guarantee payment for labor and materials on a project if the contractor defaults or otherwise fails to make payments
Within a means of egress systems, what are the exit access areas? - CORRECT ANSWER -Within a means of egress system, these are the areas that do not provide a protected path of travel and which lead to the entrance of an exit.In the International Building Code, even fire-rated corridors are included in this category
What are four advantages of using portland cement plaster as a finish material? - CORRECT ANSWER -As a finish material,
this has the advantages of being: 1 / 4
- | P a g e
-hard and abrasion resistant -water resistant -easily formed into curved and ornate surfaces -a good base for wall tile
What is the CAL TB 133 test? - CORRECT ANSWER -This test evaluates the response of an actual sample of furniture to an open flame. It is also known as NFPA 266 or the full seating test
What does general liability insurance cover? - CORRECT ANSWER-This type of insurance covers a range of items, including property damage, personal injury caused by the designer or employees, and other liabilities if contractors or subcontractors do not have their own insurance
What are the four primary advantages of negotiating a contract?
- CORRECT ANSWER -Some of the advantages of this process
include:
-the owner can pick a specific contractor -a realistic project cost is developed from the beginning -the contractor can assist in reducing the cost of the project -the contractor can point out problems in the design
- / 4
- | P a g e
What two types of product labels does the Underwriters Laboratories (UL) provide? - CORRECT ANSWER -The two
types of product labels provided by this organization are:
-listed labels -classified labels
What seven types of information are typically included in the instructions to bidders? - CORRECT ANSWER -This document
typically gives information about:
-procedures for submitting bids -where to obtain bidding documents -procedures for opening bids -submittals required with the bids -bidders representation statements -required bonds -procedures for issuing addenda and other modifications
What are the six basic components of an owner-vendor agreement (or owner-contractor agreement)? - CORRECT
ANSWER-This document is composed of:
-the agreement itself -the conditions of the contract (general, supplementary, or other) -the drawings 3 / 4
- | P a g e
-the specifications -all addenda -all modifications issued after the execution of the contract
Who is responsible for providing any laboratory tests, inspections, and reports required by the contract documents? - CORRECT ANSWER -When these procedures are required by the contract documents, the owner must provide them
What are three obligations of the interior designer during the bidding phase of the project? - CORRECT ANSWER -During this phase of a project, the designer assists the owner (client) in
preparing the documents and forms of agreement by:
-filing the necessary forms for governmental approvals -obtaining proposals -evaluating the contractors proposals
How is the occupant load of a space calculated? - CORRECT ANSWER-To calculate this value for a space, the total area in square feet is divided by the occupant load factor
What are five responsibilities of the owner during furniture installation? - CORRECT ANSWER -During this phase of a
project, the owner is responsible for:
- / 4