pg. 1 NICET Level 2 Complete Exam/ Actual Exam Questions with Correct Verified Answers/ Rated A+ (Latest Update 2024)

How is the yield of asphalt calculated?

  • By dividing the volume of the mix by the weight of the hot mix asphalt
  • By dividing the weight of the hot mix asphalt by the volume of the mix
  • By dividing the weight of the aggregate by the volume of the mix
  • By dividing the volume of the mix by the weight of the aggregate - Correct Answer -
  • By dividing the weight of the hot mix asphalt by the volume of the mix

What are some properties of asphalt mixes that should be visually identified?

  • The gradation of the aggregate, the binder content, and the overall appearance of
  • the mix

  • The strength of the mix, the temperature of the mix, and the moisture content of the
  • mix

  • The compaction of the mix, the curing time of the mix, and the durability of the mix
  • The color of the mix, the texture of the mix, and the smell of the mix - Correct Answer
  • The gradation of the aggregate, the binder content, and the overall appearance of
  • the mix

What is the purpose of materials sampling for testing in asphalt pavement construction?

  • To verify that the asphalt mix meets the specified requirements for the project
  • To determine the strength of the mix
  • To calculate the yield of the asphalt 1 / 4

pg. 2

  • To ensure that the asphalt is properly compacted - Correct Answer - A) To verify that
  • the asphalt mix meets the specified requirements for the project

What should be inspected after placing asphalt?

  • The delivery, placement, compaction, and finishing of asphalt
  • The application of tack coats
  • The requirements for materials sampling for testing
  • All of the above - Correct Answer - D) All of the above

When is a tack coat typically applied?

  • Before the first layer of hot mix asphalt is placed
  • After the first layer of hot mix asphalt is placed
  • Before the final layer of hot mix asphalt is placed
  • After the final layer of hot mix asphalt is placed - Correct Answer - C) Before the final
  • layer of hot mix asphalt is placed

What is the minimum slump of concrete used in pavement construction?

  • 2 inches
  • 3 inches
  • 4 inches
  • 5 inches - Correct Answer - b) 3 inches

What is the maximum allowable deviation from the specified profile for a finished concrete pavement surface?

  • 1/4 inch
  • 1/2 inch
  • 3/4 inch
  • 1 inch - Correct Answer - a) 1/4 inch 2 / 4

pg. 3

How often should the surface of concrete pavement be checked for proper curing?

a) Once per day

b) Once per week

c) Once per month

d) Once per year - Correct Answer - a) Once per day

What is the maximum allowable temperature difference between the center and the surface of the concrete pavement during finishing?

  • 20°F
  • 25°F
  • 30°F
  • 35°F - Correct Answer - b) 25°F

What is the first step in inspecting precast box culverts?

  • Inspecting the forms and reinforcing steel
  • Inspecting the bedding and installation of footings
  • Inspecting the delivery and method of placement of concrete
  • Inspecting delivered precast box culverts - Correct Answer - D. Inspecting delivered
  • precast box culverts

What is the purpose of inspecting bedding and installation of footings and basic driven piles?

  • To ensure the proper placement of forms and reinforcing steel
  • To ensure the structural components are cast-in-place 3 / 4

pg. 4

  • To ensure that they are properly installed
  • To calculate pay weight - Correct Answer - C. To ensure that they are properly
  • installed

What is the primary function of forms and reinforcing steel for structures?

  • To ensure the proper placement of bedding and installation of footings and basic
  • driven piles

  • To ensure the structural components are cast-in-place
  • To give the structure its shape and provide strength
  • To calculate pay weight - Correct Answer - C. To give the structure its shape and
  • provide strength

What is the primary function of inspecting delivery and method of placement of concrete for structures?

  • To ensure the proper placement of forms and reinforcing steel
  • To ensure the structural components are cast-in-place
  • To ensure the concrete meets testing and certification requirements
  • To ensure the proper delivery and placement method of concrete - Correct Answer -
  • To ensure the proper delivery and placement method of concrete

How is the compaction of asphalt mixes typically achieved?

  • By using a steamroller
  • By using a vibrating roller
  • By using a hand tamper
  • By using a pneumatic roller - Correct Answer - B) By using a vibrating roller

  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Aug 27, 2025
Description:

pg. 1 NICET Level 2 Complete Exam/ Actual Exam Questions with Correct Verified Answers/ Rated A+ (Latest Update 2024) How is the yield of asphalt calculated? A) By dividing the volume of the mix by...

Get this document $30.00