pg. 1 NICET Level 2 Complete Exam/ Actual Exam Questions with Correct Verified Answers/ Rated A+ (Latest Update 2024)
How is the yield of asphalt calculated?
- By dividing the volume of the mix by the weight of the hot mix asphalt
- By dividing the weight of the hot mix asphalt by the volume of the mix
- By dividing the weight of the aggregate by the volume of the mix
- By dividing the volume of the mix by the weight of the aggregate - Correct Answer -
- By dividing the weight of the hot mix asphalt by the volume of the mix
What are some properties of asphalt mixes that should be visually identified?
- The gradation of the aggregate, the binder content, and the overall appearance of
- The strength of the mix, the temperature of the mix, and the moisture content of the
- The compaction of the mix, the curing time of the mix, and the durability of the mix
- The color of the mix, the texture of the mix, and the smell of the mix - Correct Answer
- The gradation of the aggregate, the binder content, and the overall appearance of
the mix
mix
the mix
What is the purpose of materials sampling for testing in asphalt pavement construction?
- To verify that the asphalt mix meets the specified requirements for the project
- To determine the strength of the mix
- To calculate the yield of the asphalt 1 / 4
pg. 2
- To ensure that the asphalt is properly compacted - Correct Answer - A) To verify that
the asphalt mix meets the specified requirements for the project
What should be inspected after placing asphalt?
- The delivery, placement, compaction, and finishing of asphalt
- The application of tack coats
- The requirements for materials sampling for testing
- All of the above - Correct Answer - D) All of the above
When is a tack coat typically applied?
- Before the first layer of hot mix asphalt is placed
- After the first layer of hot mix asphalt is placed
- Before the final layer of hot mix asphalt is placed
- After the final layer of hot mix asphalt is placed - Correct Answer - C) Before the final
layer of hot mix asphalt is placed
What is the minimum slump of concrete used in pavement construction?
- 2 inches
- 3 inches
- 4 inches
- 5 inches - Correct Answer - b) 3 inches
What is the maximum allowable deviation from the specified profile for a finished concrete pavement surface?
- 1/4 inch
- 1/2 inch
- 3/4 inch
- 1 inch - Correct Answer - a) 1/4 inch 2 / 4
pg. 3
How often should the surface of concrete pavement be checked for proper curing?
a) Once per day
b) Once per week
c) Once per month
d) Once per year - Correct Answer - a) Once per day
What is the maximum allowable temperature difference between the center and the surface of the concrete pavement during finishing?
- 20°F
- 25°F
- 30°F
- 35°F - Correct Answer - b) 25°F
What is the first step in inspecting precast box culverts?
- Inspecting the forms and reinforcing steel
- Inspecting the bedding and installation of footings
- Inspecting the delivery and method of placement of concrete
- Inspecting delivered precast box culverts - Correct Answer - D. Inspecting delivered
precast box culverts
What is the purpose of inspecting bedding and installation of footings and basic driven piles?
- To ensure the proper placement of forms and reinforcing steel
- To ensure the structural components are cast-in-place 3 / 4
pg. 4
- To ensure that they are properly installed
- To calculate pay weight - Correct Answer - C. To ensure that they are properly
installed
What is the primary function of forms and reinforcing steel for structures?
- To ensure the proper placement of bedding and installation of footings and basic
- To ensure the structural components are cast-in-place
- To give the structure its shape and provide strength
- To calculate pay weight - Correct Answer - C. To give the structure its shape and
driven piles
provide strength
What is the primary function of inspecting delivery and method of placement of concrete for structures?
- To ensure the proper placement of forms and reinforcing steel
- To ensure the structural components are cast-in-place
- To ensure the concrete meets testing and certification requirements
- To ensure the proper delivery and placement method of concrete - Correct Answer -
- To ensure the proper delivery and placement method of concrete
How is the compaction of asphalt mixes typically achieved?
- By using a steamroller
- By using a vibrating roller
- By using a hand tamper
- By using a pneumatic roller - Correct Answer - B) By using a vibrating roller