10 Strategic OM Decisions -CORRECT ANSWER: 1. Design of goods and services

  • Managing quality
  • Process strategy
  • Location strategies
  • Layout strategies
  • Human resources
  • Supply-chain management
  • Inventory management
  • Scheduling
  • Maintenance

A company wishes to design a repetitive process. The manager knows that making a product takes (at a minimum) 5 minutes and estimates they will have to make 120 units every hour. What is the minimum number of workstation required? -CORRECT

ANSWER: 10

A machine has a design capacity of 5,000 and an effective capacity of 4,000 units per year. If the expects output is 3,000 per year, what would be the Utilization? -CORRECT

ANSWER: 60%

A manager checked production records and found that a worker produced 100 units while working 40 hours. In the previous week, the same worker produced 60 units while working 30 hours. What is the Labor Productivity Growth (Decline)? -CORRECT

ANSWER: 25%

  • / 3

A process has a fixed cost of $20,000, variable costs per unit of $10 and outputs can be sold for $15 per unit.

what is the break-even point? -CORRECT ANSWER: 4000 units

A service company processes an average of 50 customers per 8 hour work day. The firms has 4 employees. The hourly wage is $10, the overhead is 1.2 times labor cost, and material cost is $5 per customer. What is the company's multi-factor productivity

(customers/$)? -CORRECT ANSWER: .052

actual output -CORRECT ANSWER: rate of output actually achieved - cannot exceed

effective capacity

advantages of a batch -CORRECT ANSWER: flexibility; easy to add or change products or services

advantages of a continuous process -CORRECT ANSWER: very efficient, very high

volume

advantages of a job shop -CORRECT ANSWER: - able to handle a wide variety of work

advantages of a repetitive/ assembly line -CORRECT ANSWER: low unit cost, high

volume, and efficient

advantages of process layouts/ job shop -CORRECT ANSWER: o Can handle a variety

of processing requirements

  • Not particularly vulnerable to equipment failures
  • General-purpose equipment is often less costly to maintain
  • It is possible to use individual incentive systems
  • / 3

advantages of product layouts/ repetitive process -CORRECT ANSWER: - high rate of output

  • low unit cost
  • labor specialization
  • low material handling cost/ unit
  • high utilization of labor and equipment
  • established routing and scheduling
  • routine accounting, purchasing, and inventory control

Amazon recently opened "Amazon Go". This is a grocery store located in Seattle, Washington which eliminates the checkout process. Which competitive advantage is

Amazon gaining over neighboring traditional grocery stores? -CORRECT ANSWER:

response-time

balance delay -CORRECT ANSWER: percentage of idle time of a line

batch -CORRECT ANSWER: moderate volume, semi-standardized goods or services

(bakery)

bottleneck operation -CORRECT ANSWER: an operation in a sequence of operation

whose capacity is lower than that of the other operations

capital (productivity variable) -CORRECT ANSWER: contributes about 38% of the

annual increase

Closeness Ratings (Relationship Diagramming) -CORRECT ANSWER: allows the

considerations of multiple qualitative criteria, input from management or subjective analysis, and indicated the relative importance of each combination of department pairs

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 26, 2025
Description:

OSCM 373 Exam 1 Latest Update 2025-2026 165 Questions and 100% Verified Correct Answers Guaranteed A+ 10 Strategic OM Decisions -CORRECT ANSWER: 1. Design of goods and services 2. Managing quality ...

Get this document $30.00