Question : All of the following are limits that must be

submitted to PJM for generating units EXCEPT:

Eco Min

Eco Max

Emergency Max

Dynamic Instability

Correct answer: Dynamic Instability

Question : If PJM experienced an event that caused the loss

of a 1,000 MW generator, which of the following would most likely provide the quickest impact to improve the undegenerating Area Control Area (ACE)?

Remedial Action Reserve

Synch Reserve

Non-Synch Reserve

Secondary Reserve

Correct answer: Synch Reserve

Question : Which of the following would NOT be a cause for

a sudden deviation in the balancing area ACE?

incorrect interchange number

loss of a tie-line RTU

loss of internal load

loss of adjacent control area generation

Correct answer: loss of adjacent control area generation

Question : Which of the following facilities would be given a

priority in restoring auxiliary power following a PJM system blackout?

a generator that was online and t ripped but has a ruptured turbine disk

a drum type oil fired unit that tripped during the event and has no damage

a CT that is remote and has a 30% dependability rating

a cold fired generator that was offline, but can be on in < 12 hrs

Correct answer: a drum type oil fired unit that tripped during

the event and has no damage

Question : when PJM issues a Voltage Reduction Alert,

which of the following is NOT an appropriate action for a Member dispatcher to take?

take steps to expedite the reduction, if needed

advise all station an key personnel

notify management

Proceed on the basis that a voltage reduction will not be required.

Correct answer: proceed on the basis that a voltage reduction

will not be required

Question : Which of the following generators would quality

for synchronized reserve under non-restoration conditions?a quickstart CT that can be loaded in 8 minutes

a 300 mw steam unit that is at full output a hydro unit that is offline a 150 MW steam unit that is loaded at 75 mw

Correct answer: a 150 MW steam unit that is loaded at 75

mw

Question : Following a system disturbance that caused a

partial blackout, what would be the order of actions to be taken by the system operator?

stabilize the generators that survived the event

I.D. the sequence for restoring generation

I.D. which generators will require auxiliary power

Assess system and determine surviving units

Correct answer: 4, 1, 3, 2

Question : Which of the following is true about the cost

capping of a generator?

Cost capping only occurs for steam generators

a unit is only cost capped for Reactive Transfer Limits

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 18, 2025
Description:

PJM GENERATOR E XAM | 60 QUESTIONS WITH 100% CORRECT AN SWERS | VERIFIED | LATEST UPDATE Question : All of the following are limits that must be submitted to PJM for generating units EXCEPT: Eco Mi...

Get this document $30.00