NICET Highway Construction Inspector Level III Practice Exam 1 Latest Update 2025-2026 60 Questions and 100% Verified Correct Answers Guaranteed A+

A contract requires that a 16,000-ton aggregate stockpile be constructed. Upon testing, it was found that the last day's production of crushed aggregate was partially nonconforming for gradation. What can the contractor propose as a remedy?

a) Approve the material based on prior positive test results.

b) Ask for a reduction in gradation requirements.

c) Eliminate the last day's work from the pile and pay.

d) Thoroughly mix the last day's production and retest. - CORRECT ANSWER: d)

Thoroughly mix the last day's production and retest.

A contractor is permitted open yard storage on the project site to store lumber, flammable liquids, and other items. OSHA requires which three safety conditions regarding the storage of these items? (Choose three).

a) Combustible materials must be piled, with due regard to stability, not higher than 20

feet.

b) Driveways between combustible storage must be at least 15-feet wide and kept free

of debris.

c) Fire extinguishers shall be available within the area.

d) Materials may be stored however the contractor see fit. - CORRECT ANSWER: a)

Combustible materials must be piled, with due regard to stability, not higher than 20 feet.

b) Driveways between combustible storage must be at least 15-feet wide and kept free

of debris. 1 / 3

c) Fire extinguishers shall be available within the area.

A failed sloped is regraded to help stabilize the slope. What is the main purpose of the regrading?

  • add fill at the top of the slope
  • reduce concentrated flow
  • remove soil at the top of the slope

d) remove vegetation - CORRECT ANSWER: b) reduce concentrated flow

According to FP-14, during preassembly for field conditions, how shall girders and beams be assembled?

  • in cambered condition
  • in dead load position
  • in live load position

d) per the erection plan - CORRECT ANSWER: a) in cambered condition

According to FP-14, if testing is not being performed, what is the minimum waiting period for tensioning after the last concrete has be placed?

  • 7 days
  • 10 days
  • 14 days

d) 28 days - CORRECT ANSWER: b) 10 days

According to FP-14, when removing existing concrete structure in the roadbed, how many inches below the subgrade elevation should the existing structure be removed to? 2 / 3

  • 12 inches
  • 24 inches
  • 30 inches

d) 36 inches - CORRECT ANSWER: d) 36 inches

After flushing but before connecting a new main to the existing system, what test does an inspector need to verify before placing the main into service?

  • bacteriological testing
  • cover testing
  • deflection testing

d) pressure testing - CORRECT ANSWER: d) pressure testing

After installation of wiring for each electrical system and before making corrections, which of the following test must be performed on each circuit using suitable equipment?

  • amperage, ground, and polarity
  • continuity, ground, and insulation resistance to ground
  • fault, ground, and amperage

d) wire, polarity, and continuity - CORRECT ANSWER: b) continuity, ground, and

insulation resistance to ground

Driven falsework piles shall be removed if they are less than how many inches below subgrade with a roadbed?

  • 11 inches
  • 15 inches
  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 27, 2025
Description:

NICET Highway Construction Inspector Level III Practice Exam 1 Latest Update 2025-2026 60 Questions and 100% Verified Correct Answers Guaranteed A+ A contract requires that a 16,000-ton aggregate s...

Get this document $30.00