- | Page
PROCORE FINAL EXAM | QUESTIONS
WITH 100% CORRECT AN SWERS |
VERIFIED
Question : What is an important best practice you should
communicate to the Design team about the formatting of the spec book?
- The table of contents should be in the first 20 pages of
- The spec section number and description should be in
- There should not be any text that looks like a spec
- All of the above
the spec book
the header and footer of every page
section number in the header or footer of the page
Correct answer: d. All of the above
Question : True or False: To upload a revision to your spec book, you will first need to delete the old version from Procore.
Correct answer: False
- | Page
Question : Why are some action buttons inactive and
gray?
Correct answer: Because certain actions require that you
first select one or more spec sections before the button becomes orange/clickable
Question : In Procore, what does it mean if there is a blue
caret in a field?
Correct answer: The field is editable in-line
Question : True or False: If you have a project with more than one building or area, you should enable the "Drawings by Area" feature.
Correct answer: True
Question : True or False: When you click a project's Drawings tool, you should expect to see the project's "current set" of drawings. (i.e. The most recently uploaded revisions of each drawing.)
Correct answer: True
- | Page
Question : If you see this icon next to a drawing, what
does it mean?square & triangle
Correct answer: The drawing contains manually added
markups
Question : If you see this icon next to a drawing, what
does it mean?
SK
Correct answer: The drawing has sketches associated with
it
Question : Who can view drawing markups on your
'Personal' layer?
Correct answer: Only you
Question : True or False: You can now have your Design Team upload drawings directly to the Drawings tool without having the drawings be published immediately.
- | Page
Correct answer: True
Question : True or False: You can add correspondence types by selecting from a template or creating your own.
Correct answer: True
Question : Which permission level on the Photos tool
does Procore recommend you give to architects and engineers who are collaborators on the project if you want them to upload photos, but not have access to the configuration settings?
Correct answer: Standard
Question : Which upload option should you choose if you
would like to add markups before the photo is added to Procore?
Correct answer: Take photo
Question : True or False: As a best practice, you should create your entire project schedule directly in Procore.