Question 1: What is an important best practice you should
communicate to the Design team about the formatting of the spec book?
CORRECT ANSWER : d. All of the above
- The table of contents should be in the first 20 pages of the
- The spec section number and description should be in the
- There should not be any text that looks like a spec section
- All of the above
spec book
header and footer of every page
number in the header or footer of the page
Question 2: True or False: To upload a revision to your spec book, you will first need to delete the old version from Procore.
CORRECT ANSWER : False
Question 3: Why are some action buttons inactive and gray?
- | Page
CORRECT ANSWER : Because certain actions require that you
first select one or more spec sections before the button becomes orange/clickable
Question 4: In Procore, what does it mean if there is a blue caret
in a field?
CORRECT ANSWER : The field is editable in-line
Question 5: True or False: If you have a project with more than one building or area, you should enable the "Drawings by Area" feature.
CORRECT ANSWER : True
Question 6: True or False: When you click a project's Drawings tool, you should expect to see the project's "current set" of drawings. (i.e. The most recently uploaded revisions of each drawing.)
CORRECT ANSWER : True
- | Page
Question 7: If you see this icon next to a drawing, what does it
mean? square & triangle
CORRECT ANSWER : The drawing contains manually added
markups
Question 8: If you see this icon next to a drawing, what does it
mean? SK
CORRECT ANSWER : The drawing has sketches associated
with it
Question 9: Who can view drawing markups on your 'Personal'
layer?
CORRECT ANSWER : Only you
Question 10: True or False: You can now have your Design Team upload drawings directly to the Drawings tool without having the drawings be published immediately.
- | Page
CORRECT ANSWER : True
Question 11: True or False: You can add correspondence types by selecting from a template or creating your own.
CORRECT ANSWER : True
Question 12: Which permission level on the Photos tool does
Procore recommend you give to architects and engineers who are collaborators on the project if you want them to upload photos, but not have access to the configuration settings?
CORRECT ANSWER : Standard
Question 13: Which upload option should you choose if you
would like to add markups before the photo is added to Procore?