QSP Exam 2024/2 025 Questions with Correct Answers 100% Verified Rated A+ When does the CGP apply? - Correct Answer Any construction or demolition of one acre or more

Activities under the CGP include:

  • Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the
  • facility.

  • Disturbances to land surfaces solely related to agricultural operations.
  • Clearing and grading 2 acres of land
  • Discharges of storm water from areas on tribal lands. - Correct Answer C
  • TRUE OR FALSE: if construction of an LUP will occur across several properties, the utility company, municipality, or other public/private company/agency that owns or operates the LUP project is responsible for obtaining coverage - Correct Answer True

Risk Level 2 monitoring requirements include:

  • Effluent sampling where applicable
  • Sampling for pH and turbidity
  • Sampling for pH, turbidity, and suspended sediments - Correct Answer B
  • All NAL data must be uploaded within ___ after NAL exceedance has been identified

  • 24 hours
  • 1 week
  • 10 days
  • 2 weeks - Correct Answer C
  • Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity?

  • Qualified SWPPP Developer (QSD)
  • Legally Responsible Person (LRP) or the LRP's Approved Signatory 1 / 2
  • Qualified SWPPP Practitioner (QSP)
  • The CEO - Correct Answer B
  • Which regulation establishes a framework for regulating municipal and industrial storm water

discharges to waters of the United States:

  • Clean Water Act (CWA)
  • Porter-Cologne Water Quality Control Act
  • Endangered Species Act
  • U.S. Environmental Protection Agency (USEPA)
  • California Environmental Quality Act (CEQA) - Correct Answer A
  • Certain non-storm water discharges may be necessary for the completion of construction projects.Therefore the General Permit authorizes such discharges provided they meet the following conditions

except:

  • Meet the NALs for pH and turbidity
  • Not cause or contribute to a violation of water quality standards
  • Comply with BMPs as described in the SWPPP
  • Be infeasible to eliminate
  • Causes or threatens to cause pollution, contamination, or nuisance - Correct Answer E
  • When possible, use erosion controls as the ___ protection, with sediment controls as a ___system.

  • primary, secondary
  • secondary, primary - Correct Answer A
  • A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is...

  • erosion control
  • run on/ run off control
  • sediment control - Correct Answer B
  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 5, 2025
Description:

QSP Exam 025 Questions with Correct Answers 100% Verified Rated A+ When does the CGP apply? - Correct Answer Any construction or demolition of one acre or more Activities under the CGP include: a. ...