QSP Exam 2024/2 025 Questions with Correct Answers 100% Verified Rated A+ When does the CGP apply? - Correct Answer Any construction or demolition of one acre or more
Activities under the CGP include:
- Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the
- Disturbances to land surfaces solely related to agricultural operations.
- Clearing and grading 2 acres of land
- Discharges of storm water from areas on tribal lands. - Correct Answer C
facility.
TRUE OR FALSE: if construction of an LUP will occur across several properties, the utility company, municipality, or other public/private company/agency that owns or operates the LUP project is responsible for obtaining coverage - Correct Answer True
Risk Level 2 monitoring requirements include:
- Effluent sampling where applicable
- Sampling for pH and turbidity
- Sampling for pH, turbidity, and suspended sediments - Correct Answer B
- 24 hours
- 1 week
- 10 days
- 2 weeks - Correct Answer C
- Qualified SWPPP Developer (QSD)
- Legally Responsible Person (LRP) or the LRP's Approved Signatory 1 / 2
All NAL data must be uploaded within ___ after NAL exceedance has been identified
Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity?
- Qualified SWPPP Practitioner (QSP)
- The CEO - Correct Answer B
Which regulation establishes a framework for regulating municipal and industrial storm water
discharges to waters of the United States:
- Clean Water Act (CWA)
- Porter-Cologne Water Quality Control Act
- Endangered Species Act
- U.S. Environmental Protection Agency (USEPA)
- California Environmental Quality Act (CEQA) - Correct Answer A
Certain non-storm water discharges may be necessary for the completion of construction projects.Therefore the General Permit authorizes such discharges provided they meet the following conditions
except:
- Meet the NALs for pH and turbidity
- Not cause or contribute to a violation of water quality standards
- Comply with BMPs as described in the SWPPP
- Be infeasible to eliminate
- Causes or threatens to cause pollution, contamination, or nuisance - Correct Answer E
- primary, secondary
- secondary, primary - Correct Answer A
- erosion control
- run on/ run off control
- sediment control - Correct Answer B
- / 2
When possible, use erosion controls as the ___ protection, with sediment controls as a ___system.
A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is...