A discharged shall ensure that a paper copy of each rain event action plan is

CORRECT ANSWER: Maintained onsite - CORRECT ANSWER: Maintained onsite

A discharger is considered covered by the construction general permit when

CORRECT ANSWER: PRDs have been filed **** unsure - CORRECT ANSWER: PRDs have been filed **** unsure

A discharger must notify the Regional Water Boards if there are planned changes in the construction activity that

CORRECT ANSWER: May result in non-compliance - CORRECT ANSWER: May result in non-compliance

A likely precipitation event is any weather pattern that is forecasted to have a ____% or greater probability of producing precipitation in the project area.

  • 10
  • 25
  • 50
  • 75

e. 99 - CORRECT ANSWER: C

  • / 3

A QSP is responsible for:

  • Day to day implementation, inspections, and observations
  • Amending the SWPPP as required
  • Developing and certifying the SWPPP

d. Certifying reports in SMARTS - CORRECT ANSWER: a. Day to day implementation,

inspections, and observations

A qualifying storm event is

CORRECT ANSWER: A rain event that produces 1/2 inch or more of precipitation with a

period of 48 hours or more between rain events. ****check - CORRECT ANSWER: A

rain event that produces 1/2 inch or more of precipitation with a period of 48 hours or more between rain events. *****check

A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an...

  • Qualifying rain event
  • Extended storm event
  • Inactive storm event

d. Unsafe monitoring event - CORRECT ANSWER: a. Qualifying rain event

A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is...

  • erosion control
  • run on/ run off control
  • sediment control - CORRECT ANSWER: b. run on/ run off control 2 / 3

Acceptable methods to demonstrate final stabilization include:

  • 50%vegetative coverage
  • 100% vegetative coverage

c. RUSLE 2 method - CORRECT ANSWER: c. RUSLE 2 method

Activities under the CGP include:

  • Routine maintenance to maintain original line and grade, hydraulic capacity, or
  • original purpose of the facility.

  • Disturbances to land surfaces solely related to agricultural operations.
  • Clearing and grading 2 acres of land

d. Discharges of storm water from areas on tribal lands. - CORRECT ANSWER: c.

Clearing and grading 2 acres of land

All NAL data must be uploaded within ___ after NAL exceedance has been identified

  • 24 hours
  • 1 week
  • 10 days

d. 2 weeks - CORRECT ANSWER: c. 10 days

All permit registration documents (PRDs) must be certified by ________

CORRECT ANSWER: a legally responsible person (LRP) or legally authorized

approved signatory - CORRECT ANSWER: a legally responsible person (LRP) or

legally authorized approved signatory

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration