QSP EXAM WITH 180+ QUESTIONS & CORRECT

ANSWERS LATEST 2024 EXAM GRADED A

A likely precipitation event is any weather pattern that is forecasted to have a ____% or greater probability of producing precipitation in the project area.

  • 10
  • 25
  • 50
  • 75
  • 99 - ANSWER-C

A QSP is responsible for:

  • Day to day implementation, inspections, and observations
  • Amending the SWPPP as required
  • Developing and certifying the SWPPP
  • Certifying reports in SMARTS - ANSWER-a. Day to day implementation,
  • inspections, and observations

A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an...

  • Qualifying rain event
  • Extended storm event 1 / 4
  • Inactive storm event
  • Unsafe monitoring event - ANSWER-a. Qualifying rain event

A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is...

  • erosion control
  • run on/ run off control
  • sediment control - ANSWER-b. run on/ run off control

Acceptable methods to demonstrate final stabilization include:

  • 50%vegetative coverage
  • 100% vegetative coverage
  • RUSLE 2 method - ANSWER-c. RUSLE 2 method

Activities under the CGP include:

  • Routine maintenance to maintain original line and grade, hydraulic capacity, or
  • original purpose of the facility.

  • Disturbances to land surfaces solely related to agricultural operations.
  • Clearing and grading 2 acres of land
  • Discharges of storm water from areas on tribal lands. - ANSWER-c. Clearing
  • and grading 2 acres of land

All NAL data must be uploaded within ___ after NAL exceedance has been identified 2 / 4

  • 24 hours
  • 1 week
  • 10 days
  • 2 weeks - ANSWER-c. 10 days

Certain non-storm water discharges may be necessary for the completion of construction projects. Therefore the General Permit authorizes such discharges

provided they meet the following conditions except:

  • Meet the NALs for pH and turbidity
  • Not cause or contribute to a violation of water quality standards
  • Comply with BMPs as described in the SWPPP
  • Be infeasible to eliminate
  • Causes or threatens to cause pollution, contamination, or nuisance - ANSWER-
  • Causes or threatens to cause pollution, contamination, or nuisance

Hydrologic source controls are a design technique that minimize and/or slow the

rate of stormwater runoff from the site. Examples include:

  • Reduction of pervious surfaces
  • Use of landscaping as a storm drain treatment feature
  • Drain rooftop downspouts to impervious areas
  • Stormwater treatment facility - ANSWER-b. Use of landscaping as a storm
  • drain treatment feature

If the R Factor is ____, you can apply for the Erosivity Waiver. 3 / 4

  • 1
  • Less than 1
  • 5
  • Less than 5 - ANSWER-d. Less than 5

NEL Violation Reports must be submitted to State Board within 24 hours after

exceedance has been identified. NEL's are only subject to:

  • Risk Level 1
  • Risk Level 2
  • Risk Level 3
  • ATS Sites only - ANSWER-d. ATS Sites only

Once identified, dischargers shall begin implementing repairs or design changes to

BMPs:

  • Immediately
  • Within 24 hours
  • Within 48 hours
  • ASAP, but not more than 72 hours - ANSWER-d. ASAP, but not more than 72
  • hours

Permit Registration Documents (PRDs) shall consist of all of the following except:

  • Site Map
  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Questions & answers
Added: Sep 7, 2025
Description:

QSP EXAM WITH 180+ QUESTIONS & CORRECT ANSWERS LATEST 2024 EXAM GRADED A A likely precipitation event is any weather pattern that is forecasted to have a ____% or greater probability of producing p...

Get this document $30.00