RISK MANAGEMENT AND

PREPARATION OF SOP'S FOR A&E

() (A+ GUARANTEED)

Question :Which type of risk endangers lives or

resources without contributing to mission accomplishment?

Correct answer:An unnecessary risk

Question :Which Army publication provides specific

information to implement RM policies and procedures?

Correct answer:DA PAM 385-30

Question :In which phase of the RM process is the

hazard control plan developed and put into action?

Correct answer:Management phase

Question :In the assessment phase, RM practitioners

identify hazards and

Correct answer:Assess hazards

Question :what is a condition with the potential to cause

a harmful event such as injury, illness, or loss of equipment of property?

Correct answer:Hazard

Question :In this hazard scenario, what is the outcome?

Stored blasting materials + Exposure to heat = Detonation or explosion

Correct answer:Detonation or explosion

Question :Why does the RM practitioner estimate the

probability and level of severity for each hazard in step 2 of the RM process?

Correct answer:To assign a level of risk to each hazard.

Question :Which term describes the extent of expected

harm from an event, in terms of amount of injury, property damage, or other mission-impairing effect?

Correct answer:Severity

Question :Per ATP 5-19, Table 1-1, what is the

probability for a harmful occurrence expected to happen infrequently (remotely possible, could occur at some time)?

Correct answer:Unlikely (NOT THE ANSWER)

Question :Per ATP 5-19, Table 1-1, what is the severity

of a hazard if its expected consequences include complete mission failure or unacceptable collateral damage?

Correct answer:Severity is estimated as

>CATASTROPHIC< when consequences of an event, if it occurs, are expected to include death, unacceptable loss or damage, mission failure, or the loss of unit readiness.

Question :Per ATP 5-19, Table 1-1, what is the risk level

for a hazard with likely probability and negligible severity

Correct answer:Low

Question :Which information is NOT part of a hazard

control action plan?

Correct answer:Negotiations

Question :When supervising action plans, which action

is NOT something supervisors do to ensure awareness, training, and compliance?

Correct answer:Delegate supervisor duties

Question :Which is NOT a goal of evaluation feedback?

Correct answer:Ensure hazard controls are not revised

once they are implemented

Question :The Army requires SOPs for complex tasks,

those involving hazardous materials, and

Correct answer:All operations involving A&E

Question :What is the purpose of an SOP?

Correct answer:To provide clear, concise guidance to

operation personnel and aid in the training of operators.

Question :Several publications may be referenced when

developing SOPs including DA PAM 700-107, ATP 3- 90.90, and

Correct answer:The SOP portal

Question :What is the last step in the sop development

process?

Correct answer:Review SOP

Question :When developing an SOP, the first step is to

Correct answer:Determine the SOP objective.

Question :When writing an SOP, which step requires

you to explain each operating procedure in detail including how to carry it out?

Correct answer:Write detailed operating instructions

Question :Select the correct sequence of steps used for

SOP review and concurrence.

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 18, 2025
Description:

RISK MANAGEMENT AND PREPARATION OF SOP'S FOR A&E () (A+ GUARANTEED) Question :Which type of risk endangers lives or resources without contributing to mission accomplishment? Correct answer:An unnec...

Get this document $30.00