S-56 FIRE SAFETY MANAGER 57
QUESTIONS AND ANSWERS ALREADY
GRADED A+
Standpipe maintained under pressure and equipped with low pressure alarm - answer Maintained as needed Standpipe including piping leading to FD connection, inspected visually - answer Daily construction drawings used to confirm routing of unexposed standpipe sections - answer Daily FDNY/CSFM daily reports must be kept by documenting standpipe inspections, fire extingusher inspections,and upkeep permit logs - answer Daily FDNY first responders box maintenance and execution evacuation drills - answer daily, quarterly standpipe pressurizing system, and alarm tested - answer weekly licensed plumber/ fire suppression contractor perform air/water test of standpipe - answer during alarm installation standpipe alarm installation documented by CSFM - answer during alarm installation standpipe alarm soundings logged and documentation includes description of response to alarm - answer per incident standpipe repaired and retested until retesting is successful after filed bi-weekly test by licensed plumber/fire suppression subcontractor. Repairs documented - answer after failed biweekly inspection 1 / 2
sprinkler systems for use at construction sites shall be provided, maintained and made available for FD use - answer maintained as needed CSFM shall be responsible for verifying FDNY hot work permit and supervising the issuance of authorizations for hot work operations - answer daily a fire guard is required at each hot work operation while in progress and shall continue on site for minimum of 30 minutes after each hot work operation is complete. A log book shall be maintained on site - answer daily a fire guard shall be assigned one floor below hot work operations for fire exposures that are not observable by fire guard on the floor above - answer daily a fire guard shall perform patrols from 1600-2400 (4pm-12am) - answer daily all fire guards shall have Certificate of Fitness - answer maintained as needed Watch person shall be onsite from 2400-0800 (12am-8am)with the ability to notify the FD in case of fire. - answer daily Hot works permit should be onsite - answer daily First responders box contains Emergency contact numbers, FDNY permits, floor by floor logistics plan, enlarged first floor evacuation plan, standpipe riser diagram, Daily log and checklist binder
- answer Gang Box
- / 2
Coordinate with local firehouse location of gang box - answer daily