SaFe Agile Advanced Scrum Master Exam Questions and

Questions & answers Sep 5, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

SaFe Agile Advanced Scrum Master Exam Questions and Answers (2023) (Verified Answers) What is one characteristic of an effective Agile Team? - Correct Answer To provide steady, high quality, incremental value How does a Scrum Master lead a team's efforts in relentless improvement? - Correct Answer By facilitating the Iteration Retrospective How does the Scrum Master help teams address the challenges of modern Enterprises? - Correct Answer By actively addressing impediments Why are SAFe Scrum Masters challenged differently in an Enterprise? - Correct Answer The team is affected by teams and stakeholders beyond their control Which SAFe configuration requires having a Vision? - Correct Answer All SAFe configurations Which SAFe organizational construct allows businesses to build large and complex systems which require hundreds of people in a Lean-Agile manner? - Correct Answer Solution Train Who is responsible for assisting to establish Continuous Integration in SAFe? - Correct Answer The System Team SAFe Scrum Masters interact with which level(s) of Framework? - Correct Answer All Levels One of the Scrum Master's main responsibilities is to communicate with management and outside stakeholders to help the team in what way? - Correct Answer Protect them from uncontrolled addition of work What provides objective evidence that the system is iterating? - Correct Answer System Demo In complex systems development, what do local integration points ensure? - Correct Answer That each Capability of the system is meeting its responsibilities in contributing to the overall Solution Intent Which statement is true about the phase-gate Milestone model? - Correct Answer It does not mitigate risk as intended How can learning Milestones be used? - Correct Answer To test the concept of a new Feature or Capability 1 / 2

What are two reasons why too much work in process (WIP) is a problem? (Choose two.) - Correct Answer It hides bottlenecks in the workflow;It shows that the overall system is inefficient; What is the connection between feedback and optimum batch size? - Correct Answer Lack of feedback contributes to higher holding cost What is the value of periodic resynchronization? - Correct Answer It limits variance to a single time interval How should decentralized decision-making be used with respect to system design? - Correct Answer When Agile Teams are empowered, self-organized, and the design is allowed to emerge During Iteration planning, the Product Owner (PO) introduces a new Story to the team.They cannot come to a consensus on the size of the new Story and ask the PO for more details. - Correct Answer No; the team left the Story in the Team Backlog for further refinement with the PO A team's Product Owner (PO) takes an unexpected leave of absence for the last week of the Iteration. Three of the team's Stories have been completed and are waiting to be accepted. - Correct Answer Work with the Release Train Engineer to find a solution What is a recommended Story-splitting technique for Agile Teams? - Correct Answer Implement the 'happy path' first and the rest of the scenarios afterwards During Iteration Review, the team decides to carry forward three Stories to the next Iteration. This is the second time during this PI that some of the team's Stories are carried over. What are two actions the Scrum Master should take? (Choose two.) - Correct Answer Discuss the issue at the Iteration Retrospective;Perform the 5 Whys to find the root cause of the delays; What are three Iteration Retrospective anti-patterns? (Choose three.) - Correct Answer When the team's people manager comes in to observe;When only some of the team attends;When the Scrum Master decides what the retrospective topic(s) will be and directs the team on specific improvement items to work on; What anti-pattern can emerge during the scrum of scrums? - Correct Answer Scrum Masters report on the teams' task status each day What is the SAFe recommended duration of a PI? - Correct Answer 8 - 12 weeks What are two key areas a team should be organized around? (Choose two.) - Correct Answer Enablers;Features;

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Questions & answers
Added: Sep 5, 2025
Description:

SaFe Agile Advanced Scrum Master Exam Questions and Answers (Verified Answers) What is one characteristic of an effective Agile Team? - Correct Answer To provide steady, high quality, incremental v...

Get this document $30.00