Please log in to purchase this document.

Supervisor Study Guide

EXAM ELABORATIONS Sep 4, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

3M 303 WCS, 3M 303 Workcenter Supervisor Study Guide

Purpose of SKED - ANSWER-document/ plan corrective & preventative maintenance, FBRs, and training

OMMS-NG - ANSWER-Organizational Maintenance Management System Next Generation

EGL - ANSWER-Equipment Guide List: used w/ controlled MRC, locally prepared & contains information necessary for tag-out incidental to PMS accomplishment

SPETERL - ANSWER-Ship's Portable Electronic Test Equipment Requirements List

MRC - ANSWER-Maintenance Requirement Card: provides detailed procedure for

performing maintenance requirements & describes who, what, how, & with what resources a specific requirement will be accomplished; includes man hours, forecasting report, date, MRC code..

3M reference - ANSWER-NAVSEAINST 4790.8C

Safety ref - ANSWER-OPNAV 5100.19

3M - ANSWER-Maintenance Material Management

eSOMS (Automated) - ANSWER-Shift Operations Management System (electronic tag- out)

PMS - ANSWER-Planned Maintenance System

MDS - ANSWER-Maintenance Data System: documents all deferred maintenance

actions on CSMP (using OMMS)

danger tags - ANSWER-red; indicate severe danger to equipment and/or personnel if tampered with

cautions tags - ANSWER-yellow; indicate possible damage to equipment if tampered with

click on SPIN - ANSWER---> SPMIG; gives you more info such as part number

  • / 2

2D - ANSWER-Every second day

W - ANSWER-weekly

2W - ANSWER-every 2nd week

M - ANSWER-monthly

Q - ANSWER-quarterly

S - ANSWER-semi-annually

A - ANSWER-annually

Q1R - ANSWER-Quarterly, first MIP in series, as required additionally

Who is overall responsible for 3M? - ANSWER-CO

Manager of 3M? - ANSWER-XO

Ch. 9 - ANSWER-HAZMAT

CH. 23 - ANSWER-Electrical Isolation

Non- calendar periodicity - ANSWER-(R) Situational req.(U) Unscheduled maintenance (AP) Assessment Procedure

IEM - ANSWER-Inactive Equipment Maintenance

IEM Categories - ANSWER-Lay-Up Operational Test Periodic Maintenance Start-Up

FBR - ANSWER-Feedback Report

Feedback Report types - ANSWER-1. Cat A: non-technical in nature

2. Cat B: technical in nature

3. Urgent: involves safety of personnel, ship, or equipment

-all must be signed by XO and placed in FBR Log (back of 43P1)

CSMP - ANSWER-Current Ship's Maintenance Project: list of JSN/ JCNs; reflects actual material condition of ship

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: EXAM ELABORATIONS
Added: Sep 4, 2025
Description:

3M 303 WCS, 3M 303 Workcenter Supervisor Study Guide Purpose of SKED - ANSWER-document/ plan corrective & preventative maintenance, FBRs, and training OMMS-NG - ANSWER-Organizational Maintenance Ma...

Get this document $30.00