Traffic Supervisor Exam Questions & With Correct Answers Already Graded A.

Question : Is a shadow vehicle used in all traffic zones?

  • True
  • False

Correct answer: False

Question : The shadow vehicle is occupied whenever workers

are in the work area.

  • True
  • False

Correct answer: False

Question : What class one light is the shadow vehicle

equipped with?

  • Flashing Yellow Light
  • Oscillating Yellow Light
  • Yellow Strobe Light
  • All of the above

Correct answer: All of the above

Question : When may cones be substituted for drums?

  • Daytime traffic control minimum height 18"
  • Daytime traffic control minimum height 28"
  • Daytime traffic control minimum height 36"
  • Daytime traffic control minimum height 42"

Correct answer: Daytime traffic control minimum height 28"

Question : When may cones be substituted for drums?

  • Daytime traffic control minimum height 18"
  • Daytime traffic control minimum height 28"
  • Daytime traffic control minimum height 36"
  • Daytime traffic control minimum height 42"

Correct answer: Daytime traffic control minimum height 28"

Question : When cones are substituted for drums for

nighttime closers, what is the minimum cone height requirement?

  • 18"
  • 28"
  • 36"
  • 42"

Correct answer: 42"

Question : When cones are substituted for drums at nighttime

closer, what is the maximum cone spacing?

A. 20'

B. 30'

C. 40'

D. 50'

Correct answer: 40'

Question : What type of flashing warning lights are required

when there is a nighttime lane closer?

A. ROAD WORK AHEAD

B. LANE CLOSED AHEAD

  • A & B

D. NONE OF THE ABOVE

Correct answer: ROAD WORK AHEAD

&

LANE CLOSED AHEAD

Question : If there is a lane closure of greater than three days,

what is required?

  • Work zone dotted lines, 4' in length separated by 10' gaps,
  • shall be provided to identify the merge.

  • The appropriate color work zone edge lines shall be
  • applied along the taper and tangent sections.

  • All the above
  • None of the above

Correct answer: The appropriate color work zone edge lines

shall be applied along the taper and tangent sections.

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 18, 2025
Description:

Traffic Supervisor Exam Questions & With Correct Answers Already Graded A. Question : Is a shadow vehicle used in all traffic zones? A. True B. False Correct answer: False Question : The shadow veh...

Get this document $30.00